Estimator guides
Pricing a cable run from its size, and scheduling cable for a job.
- 4 min readEV charger circuit in a Victorian garageA 32 A single-phase EV charger on a Victorian house board, checked against spare capacity with the Appendix P demand, then closed with load management.

- 4 min readMaximum demand of an Australian house, Table C1A three-phase Australian house assessed with AS/NZS 3000 Table C1, group by group, giving 27.83 A per phase, then sized to the consumer mains on 3008.1.1:2025.

- 3 min readShop and office maximum demand by floor areaEstimate the maximum demand of a small retail and office building from its floor area with AS/NZS 3000 Table C3, with basement EV charging and the range.

- 5 min readWorked examples index by tool and tradeEvery AmpSize worked example in one place, grouped by calculator and tagged with the trade it was written for, from house circuits to industrial boards.

- 3 min readMaximum demand block of flats with Table C1Eighteen living units on a three phase supply assessed with AS/NZS 3000 Table C1, group by group, giving the demand per phase for the network application.

- 3 min readTransformer kVA to amps 400 V for 750 kVAA 750 kVA 11 kV to 400 V transformer at 5 percent impedance, with primary and secondary full load current and the secondary fault current for the board spec.

- 4 min read63 A three‑phase submain buried in QueenslandA 63 A three-phase submain buried direct in hot Queensland ground, sized on AS/NZS 3008.1.1:2025 with the soil and depth factors, then run again on 2017.

- 3 min readkVA to amps 3 phase for a 75 kVA chillerA 75 kVA chiller nameplate converted to full load current at 400 V three phase, with the real power figure an estimator needs for a Table C2 demand line.

- 3 min readSupply application kVA from maximum demandNetwork connection kVA from a maximum demand of 250 A at 400 V, with the real power in kW and the reactive power in kvar for the application form.

- 3 min readConduit size for 35 mm cable in a submainFour 35 mm² singles in a 50 mm conduit fill 19.48 % of the internal area, and the AmpSize engine still recommends a 40 mm conduit for this submain.

- 3 min readCommercial kitchen kW to amps full load currentTurning a 30 kW commercial kitchen nameplate load into 45.58 A at 400 V three phase, with the power factor step that a plain kW to amps sum leaves out.

- 3 min readDairy shed motor current: 15 kW at 400 VFull load current, shaft speed, torque and DOL starting current for a 15 kW 400 V dairy shed vacuum pump motor, worked through the AmpSize motor engine.

- 5 min readWhat size generator for a dairy shedSize a standby set for a dairy shed from its load list. The vacuum pump's start sets the size, then staggered steps, a drive and a soft starter shrink it.

- 5 min readCable tray fill for a plant room: a second tierLay ten multicore cables on a 300 mm perforated tray in one layer, see when it takes a second tier, and carry the grouping factor into the cable size.

- 3 min readGenerator full load current: 200 kVA to ampsA 200 kVA 400 V standby set converted to 288.68 A of full load current, 160 kW of real power and 2,405.63 A of initial fault current from 12 percent reactance.

- 3 min readOffice maximum demand per phase with Table C2An office fitout load schedule assessed against AS/NZS 3000 Table C2, group by group, landing on 413.7 A across three phases and 137.9 A per phase.

- 1 min readHow many amps can 10 mm² cable carry?10 mm² copper multicore PVC cable carries 50 A enclosed in air at 30 °C in NZ, so a 50 A breaker protects it. Clipped direct, it carries 58 A.

- 1 min readHow many amps can 16 mm² cable carry?16 mm² copper multicore PVC cable carries 66 A enclosed in air at 30 °C in NZ, so it takes a 63 A breaker. Grouped with two circuits, it carries 46.2 A.

- 3 min readSubmain voltage drop estimate for a 160 A tenderA price stage check on a 160 A submain over 80 m on 70 mm² XLPE. See the mV/A·m figure, the 1.89 percent drop and the length the budget allows.

- 3 min readSubmain cable size for 3‑phase 100 A over 60 mA 100 A tenancy submain on tray over 60 m at 40 °C. See the derating chain, the four checks and why the loop impedance check sets the size at 70 mm².

- 3 min read22 kW EV charger amps at 400 V three‑phaseA 22 kW three-phase EV charger draws 31.75 A at 400 V. See the inputs, the clause, the arithmetic and the current that feeds cable sizing and demand.

- 3 min readGenerator sizing for a 150 kVA holiday parkA 150 kVA three-phase standby set at 400 V gives 216.51 A full load current, 120 kW real power and 1443.38 A fault current from one nameplate.

- 4 min readElectrical estimating calculators NZ roundupA roundup of the calculators a New Zealand estimator uses at price stage, with a Table C2 fitout worked through to a demand of 102.95 A per phase.

- 4 min readAmpSize vs jCalc vs free cable sizing toolsCompare AmpSize with jCalc and other free cable sizing tools. One 63 A three-phase submain shows which checks decide a size, and what AmpSize leaves out.

- 3 min readAS/NZS 3000 Tables C1 and C2: demand groupsWhat the demand group letters govern, when to use Table C1 or Table C2, and a commercial assessment that returns 276.26 A total and 92.09 A per phase.

- 6 min readAS/NZS 3008.1.1 table numbers: 2017 to 2025Each AS/NZS 3008.1.1 table AmpSize reads, with its 2017 number, its 2025 number and whether its values moved, and one submain that cites both sets.

- 4 min readAS/NZS 3008.1.2 Tables 4 to 21: current ratingsWhat the current rating tables govern, which table AmpSize reads today, and a 40 A circuit that lands on 10 mm² with a derated capacity of 50 A.

- 4 min readAS/NZS 3008 Table 13 (now 3.18): multicore ratingsWhat AS/NZS 3008 Table 13 gives, why the 2025 AU part calls it Table 3.18, how to read its columns into the calculator, and what moved for buried cable.

- 3 min readMotor full load current: 11 kW 400 V DOLFull load current, shaft speed, torque and direct on line starting current for an 11 kW four-pole 400 V induction motor, with the figures the tool returns.

- 3 min readCommercial maximum demand with Table C2A tender-stage demand assessment for a commercial building using AS/NZS 3000 Table C2, with each group demand and the per-phase figure the tool returns.

- 5 min readAS/NZS 3008.1.1:2025: what changed from 2017The 2025 AU part adds d.c. ratings to 1500 V, renumbers every table and moves some ratings. Four circuits, each run on both editions, show what moves.

- 4 min readCable size for a 32 A single‑phase 25 m runWork through a 32 A single-phase circuit over 25 metres in New Zealand. See every derating factor, the check that sets the size, and the result the tool gives.

- 4 min readDomestic maximum demand with Table C1Assess the maximum demand of a New Zealand house from Table C1, group by group, with a worked example that lands on 52.61 A on a single-phase supply.

Calculators these guides use
- EV charger circuit calculatorCheck EV chargers for spare capacity, cable size and RCD.
- Maximum demand calculatorEstimate maximum demand for domestic or non‑domestic loads.
- Floor area demand calculatorEstimate commercial demand from floor area and use.
- Cable size calculatorFind the smallest cable size that passes each check.
- Transformer calculatorCalculate transformer full load current and impedance.
- Full load current calculatorCalculate full load current from power, voltage and phase.
- Three phase power calculatorConvert between power, current, voltage and power factor.
- Conduit fill calculatorCheck that a cable bundle fits in a conduit.
- Motor calculatorFind motor full load current, starting current and torque.
- Generator sizing from a load listSize a generator from a load list with motor starting.
- Cable tray and ladder fillTray or ladder width, tiers, kg/m and the grouping factor.
- Generator current calculatorFull load and fault current of a generator from its kVA.
- Existing circuit checkCheck an installed circuit: cable, device, drop and Zs.
- Voltage drop calculatorCalculate voltage drop on a cable run and check the limit.