AS/NZS 3012:2019

Cl 2.4.6 and Table 6

RCD protection and periodic verification intervals for a site under construction or demolition

The construction site supply tool reads the RCD requirement for the circuit and the periodic verification intervals of Table 6, including the note that the transportable structure intervals do not apply in New Zealand.

Verified: read against the printed standard, pages 15-17, 19-20, 25, 35-37, 44. Checked 1 Oct 2026.

Units: Required ma mA, Interval months months

These are the values AmpSize encodes. No text of the standard is reproduced. Verify against the current standard.

Back to its card on the AS/NZS 3012:2019 page

10 rows

Cl 2.4.6 and Table 6, RCD protection and periodic verification intervals for a site under construction or demolition
CaseClauseRequired ma (mA)All live conductorsLocationsExceptionsNz only exceptionsEquipmentInterval monthsNz transportable structures exempt
construction-final2.4.6.130yesoriginating-switchboardmechanical-operation-at-risk, selv-or-pelv, safety-isolating-transformer, nz-110v-centre-tapped-transformernz-110v-centre-tapped-transformer
permanent-final2.4.6.230nooriginating-switchboard, socket-outlet, portable-socket-outlet-assembly—
generator-supplied2.4.6.330yesoriginating-switchboard, generatorisolated-winding-generator
inverter-supplied2.4.6.430noinverterisolated-inverter
3.3, 3.5construction-wiring6yes
3.5portable-equipment3no
3.4portable-rcd-pushbutton—no
3.4fixed-rcd-pushbutton1no
3.4portable-rcd-operating-time3no
3.4fixed-rcd-operating-time12no