Skip to content
AmpSize

AS/NZS 3012:2019

Cl 2.1.1, 2.1.2, 2.4.6

Permitted supply arrangements for a site under construction or demolition

The construction site supply tool reads the supply arrangements allowed on a site, the rated residual current each one calls for, and which arrangements may supply only a separated circuit.

Verified: read against the printed standard, pages 11-17, 19-20. Checked 1 Oct 2026.

Units: Rcd required ma mA

These are the values AmpSize encodes. No text of the standard is reproduced. Verify against the current standard.

Back to its card on the AS/NZS 3012:2019 page

7 rows

Cl 2.1.1, 2.1.2, 2.4.6, Permitted supply arrangements for a site under construction or demolition
ClausePermittedRcd required ma (mA)All live conductorsSeparated circuit onlyMax class one items per winding
2.1.1(a)yes30yesno—
2.1.1(b)yes30nono—
2.1.1(c)yes30yesno—
2.4.6.3(a)(i)yes—noyes1
2.4.6.3(a)(ii)yes30yesno—
2.4.6.4(a)yes30nono—
2.4.6.4(b)yes—noyes1

Tools that read it (1)