Skip to content
AmpSize

AS/NZS 3012:2019

Cl 2.1.1, 2.1.2, 2.4.6

Permitted supply arrangements for a site under construction or demolition

The construction site supply tool reads the supply arrangements allowed on a site, the rated residual current each one calls for, and which arrangements may supply only a separated circuit.

Verified: read against the printed standard, pages 11–17, 19–20. Checked 1 Oct 2026.

Units: Rcd required ma mA

These are the values AmpSize encodes. No text of the standard is reproduced. Verify against the current standard.

Back to its card on the AS/NZS 3012:2019 page

7 rows

Cl 2.1.1, 2.1.2, 2.4.6, Permitted supply arrangements for a site under construction or demolition
ClausePermittedRcd required ma (mA)All live conductorsSeparated circuit onlyMax class one items per winding
2.1.1(a)yes30yesno—
2.1.1(b)yes30nono—
2.1.1(c)yes30yesno—
2.4.6.3(a)(i)yes—noyes1
2.4.6.3(a)(ii)yes30yesno—
2.4.6.4(a)yes30nono—
2.4.6.4(b)yes—noyes1

Tools that read it (1)

Guides and learn pages that cite it (2)