Skip to content
AmpSize

AS/NZS 3012:2019

AmpSize reads this standard for electrical work on a construction site or a demolition site. It covers the supply arrangements allowed there, the RCD protection and the periodic verification intervals. It also covers how long a site cord or cable may run. That run counts the lead of a plug-in, portable socket-outlet assembly, 2 m at most. Every value AmpSize takes from it was read from the rendered pages of the 2019 edition incorporating Amendment 1. Against the 2010 edition AmpSize read before, the figures hold; Table 3 becomes Table 6, Table 2 becomes Table 7, Section 3 renumbers, and a New Zealand only exception joins Cl 2.4.6.1.

Notes

Edition cited
AS/NZS 3012:2019
Amendments applied
  • Amendment 1 (4 tables)
Tables last checked
1 Oct 2026
Tables
4: 4 verified
Clauses
11

No text of the standard is reproduced here. AmpSize is a design aid. Verify results against the current standard.

Contents (15)

Clauses (11)

Tables (4)

Guides and learn pages that cite it (2)

All 24 documents