AS/NZS 3012:2019
Cl 2.4.6 and Table 6
RCD protection and periodic verification intervals for a site under construction or demolition
The construction site supply tool reads the RCD requirement for the circuit and the periodic verification intervals of Table 6, including the note that the transportable structure intervals do not apply in New Zealand.
已核验:对照印刷版标准阅读,页码 15–17, 19–20, 25, 35–37, 44。检查于 1 Oct 2026。
单位:Required ma mA, Interval months months
这些是 AmpSize 所编码的数值。不转载标准原文。请依据现行标准核对。
10 行
| Case | Clause | Required ma (mA) | All live conductors | Locations | Exceptions | Nz only exceptions | Equipment | Interval months | Nz transportable structures exempt |
|---|---|---|---|---|---|---|---|---|---|
| construction-final | 2.4.6.1 | 30 | yes | originating-switchboard | mechanical-operation-at-risk, selv-or-pelv, safety-isolating-transformer, nz-110v-centre-tapped-transformer | nz-110v-centre-tapped-transformer | |||
| permanent-final | 2.4.6.2 | 30 | no | originating-switchboard, socket‑outlet, portable-socket‑outlet-assembly | — | ||||
| generator-supplied | 2.4.6.3 | 30 | yes | originating-switchboard, generator | isolated-winding-generator | ||||
| inverter-supplied | 2.4.6.4 | 30 | no | inverter | isolated-inverter | ||||
| 3.3, 3.5 | construction-wiring | 6 | yes | ||||||
| 3.5 | portable-equipment | 3 | no | ||||||
| 3.4 | portable-rcd-pushbutton | — | no | ||||||
| 3.4 | fixed-rcd-pushbutton | 1 | no | ||||||
| 3.4 | portable-rcd-operating-time | 3 | no | ||||||
| 3.4 | fixed-rcd-operating-time | 12 | no |