AS/NZS 3012:2019
Cl 2.4.6 and Table 6
RCD protection and periodic verification intervals for a site under construction or demolition
The construction site supply tool reads the RCD requirement for the circuit and the periodic verification intervals of Table 6, including the note that the transportable structure intervals do not apply in New Zealand.
Đã xác minh: đối chiếu với tiêu chuẩn in, trang 15–17, 19–20, 25, 35–37, 44. Đã kiểm tra 1 Oct 2026.
Đơn vị: Required ma mA, Interval months months
Đây là các giá trị mà AmpSize mã hóa. Không sao chép nội dung tiêu chuẩn. Hãy đối chiếu với tiêu chuẩn hiện hành.
10 hàng
| Case | Clause | Required ma (mA) | All live conductors | Locations | Exceptions | Nz only exceptions | Equipment | Interval months | Nz transportable structures exempt |
|---|---|---|---|---|---|---|---|---|---|
| construction-final | 2.4.6.1 | 30 | yes | originating-switchboard | mechanical-operation-at-risk, selv-or-pelv, safety-isolating-transformer, nz-110v-centre-tapped-transformer | nz-110v-centre-tapped-transformer | |||
| permanent-final | 2.4.6.2 | 30 | no | originating-switchboard, socket‑outlet, portable-socket‑outlet-assembly | — | ||||
| generator-supplied | 2.4.6.3 | 30 | yes | originating-switchboard, generator | isolated-winding-generator | ||||
| inverter-supplied | 2.4.6.4 | 30 | no | inverter | isolated-inverter | ||||
| 3.3, 3.5 | construction-wiring | 6 | yes | ||||||
| 3.5 | portable-equipment | 3 | no | ||||||
| 3.4 | portable-rcd-pushbutton | — | no | ||||||
| 3.4 | fixed-rcd-pushbutton | 1 | no | ||||||
| 3.4 | portable-rcd-operating-time | 3 | no | ||||||
| 3.4 | fixed-rcd-operating-time | 12 | no |