The order of verification tests

Foundation level

A drawn testing schematic for The order of verification tests: tester, board, RCD and socket-outlet.

AS/NZS 3000 Section 8 asks for every installation to be inspected and tested before it is livened. AS/NZS 3017 sets out how, and in what order. The order is not a formality: each test relies on the one before it.

The sequence

  1. Test for de-energized. Prove there is no voltage before any other test.
  2. Earth continuity. The main earthing conductor first, then the earths and bonds of each circuit.
  3. Insulation resistance. Between live conductors and earth, and between the live conductors.
  4. Polarity and correct circuit connections. Each active switched, each circuit on its own neutral. A circuit with multi‑phase socket‑outlets also takes a phase sequence test, so every outlet of a type turns a motor the same way.
  5. Earth fault-loop impedance. With the supply on.
  6. RCD operation. Each RCD trips and disconnects the circuit.

Why this order

  • An insulation test between live parts and earth means nothing until the earth is proven: a broken earth reads as perfect insulation.
  • The loop impedance test needs the circuit livened, so polarity and insulation must already be right.
  • The RCD test needs a sound earth path, so it comes last.

If a test fails, fix the fault, then repeat that test and any earlier one the fault may have upset.

Where the limits come from

TestLimitSource
Insulation resistanceAt least 1 MΩ at 500 V; a reduced voltage for sensitive equipmentAS/NZS 3000 Cl 8.3.6
Main earthing conductor and bondingAt most 0.5 ΩAS/NZS 3000 Cl 8.3.5
Circuit earth (Re) and RpheBy device, rating and sizeAS/NZS 3000 Table 8.2
Earth fault-loop impedanceBy device and ratingAS/NZS 3000 Table 8.1
RCDOperates and disconnects; in NZ a 30 mA RCD within 300 msAS/NZS 3017 Cl 4.9.4; Electricity (Safety) Regulations reg 24

AS/NZS 3017 repeats the Section 8 figures and gives its own rounded loop impedance table. AmpSize judges Zs by Table 8.1.

Make the sheet for a board with the test schedule tool, and check a reading with the test results tool. A worked house board is in A test sheet for a house board.