AS/NZS 3012:2019

Cl 2.1.1, 2.1.2, 2.4.6

Permitted supply arrangements for a site under construction or demolition

The construction site supply tool reads the supply arrangements allowed on a site, the rated residual current each one calls for, and which arrangements may supply only a separated circuit.

Kua manatokotia: pānuitia ki te paerewa tā, whārangi 11–17, 19–20. I tirohia 1 Oct 2026.

Ngā unit: Rcd required ma mA

Ko ēnei ngā uara e tuhia ana e AmpSize. Kāore he kupu o te paerewa e tuhia ana. Whakamanahia ki te paerewa o nāianei.

Hoki ki tana kāri i te whārangi AS/NZS 3012:2019

7 rārangi

Cl 2.1.1, 2.1.2, 2.4.6, Permitted supply arrangements for a site under construction or demolition
ClausePermittedRcd required ma (mA)All live conductorsSeparated circuit onlyMax class one items per winding
2.1.1(a)yes30yesno—
2.1.1(b)yes30nono—
2.1.1(c)yes30yesno—
2.4.6.3(a)(i)yes—noyes1
2.4.6.3(a)(ii)yes30yesno—
2.4.6.4(a)yes30nono—
2.4.6.4(b)yes—noyes1