AS/NZS 3012:2019
Cl 2.1.1, 2.1.2, 2.4.6
Permitted supply arrangements for a site under construction or demolition
The construction site supply tool reads the supply arrangements allowed on a site, the rated residual current each one calls for, and which arrangements may supply only a separated circuit.
已核验:对照印刷版标准阅读,页码 11–17, 19–20。检查于 1 Oct 2026。
单位:Rcd required ma mA
这些是 AmpSize 所编码的数值。不转载标准原文。请依据现行标准核对。
7 行
| Clause | Permitted | Rcd required ma (mA) | All live conductors | Separated circuit only | Max class one items per winding |
|---|---|---|---|---|---|
| 2.1.1(a) | yes | 30 | yes | no | — |
| 2.1.1(b) | yes | 30 | no | no | — |
| 2.1.1(c) | yes | 30 | yes | no | — |
| 2.4.6.3(a)(i) | yes | — | no | yes | 1 |
| 2.4.6.3(a)(ii) | yes | 30 | yes | no | — |
| 2.4.6.4(a) | yes | 30 | no | no | — |
| 2.4.6.4(b) | yes | — | no | yes | 1 |