Electricity (Safety) Regulations 2010

reg 57, 59, 65, 74C, 74E

Thresholds and periods for prescribed electrical work

The regulatory pathway tool reads the demand thresholds of regulations 57 and 59, and the periods of regulations 65, 74C and 74E. The rows carry numbers and regulation numbers only.

Verified: read against the printed standard, pages 55, 57, 61–62, 71–73. Checked 26 Sept 2026.

Units: Value A per phase, days, working days, months or years

These are the values AmpSize encodes. No text of the standard is reproduced. Verify against the current standard.

Back to its card on the Electricity (Safety) Regulations 2010 page

9 rows

reg 57, 59, 65, 74C, 74E, Thresholds and periods for prescribed electrical work
Value (A per phase, days, working days, months or years)UnitReg
80A per phase57(2)(a)
50A per phase57(2)(b)
80A per phase59(1)(a)
50A per phase59(1)(b)
20working days74C
20days74E(2)
7years74E(3)
10working days74E(4)
6months65(5)