AS/NZS 3000:2018
Cl 2.2.2
Maximum demand by measurement and by limitation
The spare capacity tool reads the 30 minute measurement period and the two limitation methods here, and the rule that a measured demand above the calculated one is the maximum demand.
Verified: read against the printed standard, pages 77–78 (PDF 81–82). Checked 1 Oct 2026.
Units: Value per row
These are the values AmpSize encodes. No text of the standard is reproduced. Verify against the current standard.
4 rows
| Clause | Value (per row) | Unit | Page |
|---|---|---|---|
| 2.2.2 | — | — | 77 |
| 2.2.2(c) | 30 | min | 78 |
| 2.2.2(d) | — | — | 78 |
| 2.2.2(d) | — | — | 78 |
Tools that read it (1)
Guides and learn pages that cite it (8)
- Commercial kitchen kW to amps full load current
- Fixed heating maximum demand with Table C1
- Office maximum demand per phase with Table C2
- Three‑phase power: kVA to amps at 400 V
- Electrical estimating calculators NZ roundup
- AS/NZS 3000 Tables C1 and C2: demand groups
- Commercial maximum demand with Table C2
- Maximum demand and diversity