Skip to content
AmpSize

Spare capacity calculator

See if a new load fits the main switch of a supply.

Reads AS/NZS 3000:2018. Tables checked 1 Oct 2026.

Try a job 4

Each job fills in example values. Replace them with your values.

Inputs

Worked example with the default inputs. The live calculator replaces it when the page loads.

Phases
Single phase
Phase voltage
230 V
Main switch rating
63 A
Maximum demand by
Measurement, Cl 2.2.2(c)
Recorded demand, L1
38 A
Calculated demand per phase
0 A
New load in
Amps
New load
20

Left after the new load

5A

Maximum demand
38A
Spare capacity
25A
New load per phase
20A

This result is a design aid. Verify it against the current standard.

Calculation steps

  1. MethodMeasurement, the highest demand over 30 minutes

    AS/NZS 3000:2018 Cl 2.2.2(c)

  2. L1 recorded demand38A

    AS/NZS 3000:2018 Cl 2.2.2(c)

  3. Main switch rating per phase63A
  4. L1 spare capacity25A
  5. L1 left after the new loadResult5A

About this calculator

How this is calculated

The tool finds the maximum demand of an existing supply. It then finds the spare capacity against the main switch, per phase. It also checks whether a new load fits. It reads AS/NZS 3000:2018 Cl 2.2.2.

  1. Maximum demand by measurement. You enter the highest demand recorded over 30 minutes on each phase (Cl 2.2.2(c)).
  2. Calculated demand. You can also enter a calculated demand per phase. The tool uses the larger of the two, because a measured demand above the calculated one is the maximum demand (Cl 2.2.2).
  3. Maximum demand by limitation. The tool takes one fixed or adjustable circuit-breaker setting as the demand on every phase (Cl 2.2.2(d)). For mains and submains, you can enter the breakers they feed. The tool adds their settings per phase. A three-pole breaker counts on each phase.
  4. Spare capacity. It subtracts the maximum demand from the main switch rating, per phase.
  5. New load. A load in kW becomes amps at its power factor and the phase voltage. A three-phase load splits equally across the phases. A single-phase load goes on the phase you choose.
  6. Fit. It adds the new load to the maximum demand on each phase. The load fits when every phase stays at or below the main switch rating.
StepTable or clauseWhat it decides
MeasurementCl 2.2.2(c)The highest demand over the recording period
Measured above calculatedCl 2.2.2Which of the two figures is the maximum demand
LimitationCl 2.2.2(d)The demand from breaker settings
Spare capacityCl 2.2.2The room left on each phase

Worked example

Limits

  • The tool takes the main switch rating as the capacity. The supply fuse or the network agreement can be lower. Check both.
  • A recording is only as good as the day you take it. Record when the demand is at its highest.
  • The sum of breaker settings takes no diversity. It is the largest of the methods and is often above the main switch.
  • The tool does not size the cable or the protection for the new load. Use the cable size calculator and the RCD selection tool.

See also: Maximum demand by measurement and limitation, Will a heat pump fit a 63 A supply?, EV charger spare capacity on a 63 A main switch, EV charging load and spare capacity and the EV charger calculator.

Questions

Each answer describes what this tool calculates. The result is a design aid. Verify against the current standard.

How do I find the maximum demand of an existing house?

AS/NZS 3000 Cl 2.2.2 allows calculation, assessment, measurement or limitation. For an existing supply, log the demand and take the highest over 30 minutes when the house is busiest. Smart meter interval data can give it too.

What if the calculated demand is higher than the recorded one?

Enter both. The tool takes the larger on each phase. Cl 2.2.2 makes a recorded demand above the calculated one the maximum demand, so a low reading never hides a calculated load.

What is maximum demand by limitation?

A circuit-breaker can set the demand: its fixed rating, or the load setting of an adjustable one. For mains and submains, the sum of the settings of the breakers they feed also counts. The sum takes no diversity, so it is high.

Which phase should a single-phase load go on?

Put it on the phase with the most spare capacity. The tool shows what is left on each phase and fails any phase that goes past the main switch rating.

Is the main switch the real limit?

The tool takes the main switch rating as the capacity. The supply fuse, the service cable and the network agreement can be lower. Check them before you add the load.

Clauses and tables this tool reads

Every clause and table, with how each was verified

Tables last checked on 1 Oct 2026.

Was this useful?

A question, or a value that looks wrong? Contact us.