Load schedule across boards

Maximum demand of a site’s boards by switchboard diversity.

AS/NZS 3000

Reads AS/NZS 3000:2018. Tables checked 26 Sept 2026.

Try a job 4

Each job fills in example values. Replace them with your values.

Inputs

Worked example with the default inputs. The live calculator replaces it when the page loads.

Phases
Three phase
Voltage
400 V
Boards, main board first
3 rows
Boards conform to AS/NZS 61439 or AS/NZS 3439
Yes

Demand per phase

325.5A

Site maximum demand
225.5kVA
Sum of ratings at the main board
465A
Boards
3

This result is a design aid. Verify it against the current standard.

Calculation steps

  1. MSB: 8 devices, sum of ratings 465 A0.7x

    AS/NZS 3000:2018 Table C4

  2. MSB: demand325.5A

    AS/NZS 3000:2018 App C Para C2.4.4

  3. DB1: 12 devices, sum of ratings 260 A0.6x

    AS/NZS 3000:2018 Table C4

  4. DB1: demand156A

    AS/NZS 3000:2018 App C Para C2.4.4

  5. DB2: 8 devices, sum of ratings 150 A0.7x

    AS/NZS 3000:2018 Table C4

  6. DB2: demand105A

    AS/NZS 3000:2018 App C Para C2.4.4

  7. Demand per phaseResult325.5A

    AS/NZS 3000:2018 App C Para C2.4.4

  8. Site maximum demand225.5kVA

About this calculator

How this is calculated

A load schedule lists the boards of a site and what each one draws. The tool works the maximum demand of each board by the switchboard diversity method of AS/NZS 3000 Appendix C, and carries it up the tree to the main board.

Para C2.4.4 sets the method for switchboards that conform to the AS/NZS 3439 or AS/NZS 61439 series. The maximum demand of a board is the sum of the overload ratings of its circuits, times a factor from Table C4. The factor falls as the number of circuit protective devices downstream rises.

On each board the tool counts its final subcircuit devices and one device for each submain it feeds. It adds the ratings of the final subcircuits and the rating of each submain device. The submain is a circuit of the board that feeds it, so a sub-board's demand is never added twice. Table C4 prints no factor below two devices, and the tool then takes the sum as the demand.

The ratings are per phase. On a three-phase board, enter the sum on the most loaded phase, and count a three-pole device once. The tool gives each board's demand in amps and in kVA, and the site's demand at the main board.

Each sub-board's demand is checked against the device that feeds it. A board whose demand is more than its submain device gets a warning.

The schedule prints as a sheet with one row a board.

StepTable or clauseWhat it decides
Devices on a boardFinal subcircuits plus one a submainThe count Table C4 is read at
Sum of ratingsPara C2.4.4The circuits' ratings plus each submain device's rating
Diversity factorTable C4The factor for the number of devices
Board demandPara C2.4.4The sum times the factor
Submain checkThe demand against the feeding deviceWhether a submain device is smaller than its board's demand

Worked examples

Limits

The method is only for boards that conform to the AS/NZS 3439 or AS/NZS 61439 series. For other boards, use another Appendix C method, such as the maximum demand tool. With the toggle off, the tool takes no Table C4 factor and gives the sum of the ratings.

It works from device ratings, not from the loads. A board full of large devices with small loads gives a high demand. A load-by-load assessment can give a lower figure.

See also: Maximum demand, Circuit loading and Max demand by phase.

Questions

Each answer describes what this tool calculates. The result is a design aid. Verify against the current standard.

How do you work out the maximum demand of a switchboard?

By AS/NZS 3000 Para C2.4.4, add the overload ratings of the board’s circuits and multiply by the Table C4 factor for the number of devices: 0.9 for 2 or 3, 0.8 for 4 or 5, 0.7 for 6 to 9 and 0.6 for 10 or more.

How are sub-boards counted?

A submain is a circuit of the board that feeds it. The tool counts it as one device on that board, at its device rating. So a sub-board’s demand is not added to its parent a second time.

Which switchboards does the method apply to?

Para C2.4.4 is for switchboards that conform to the AS/NZS 3439 or AS/NZS 61439 series. For other boards, use another Appendix C method, such as the load groups of Table C1 or C2.

What if a board’s demand is more than its submain device?

The tool warns. The device that feeds the board is then smaller than the demand the method gives. Check the device, the cable and the loads on the board.

How do I enter a three-phase board?

Enter the sum of the ratings on the most loaded phase, and count a three-pole device once. The tool gives the demand per phase and in kVA at the voltage you set.

Clauses and tables this tool reads

Every clause and table, with how each was verified

Tables last checked on 26 Sept 2026.