Skip to content
AmpSize

Commercial · Estimator · Engineer

Site

A transformer, boards and feeders become sized submains and a supply overview.

It starts from the Construction site, temporary supply template.

  1. 1Supply and transformerEnter the transformer or the temporary supply.
  2. 2Boards and feedersAdd each board and size the feeder that supplies it.
  3. 3Areas and loadsList each area with its loads.
  4. 4Final circuitsGroup the loads into circuits and size each cable.
  5. 5OverviewThe one-line diagram with the transformer, the boards and the feeders.