Commercial · Estimator · Engineer
Site
A transformer, boards and feeders become sized submains and a supply overview.
It starts from the Construction site, temporary supply template.
- 1Supply and transformerEnter the transformer or the temporary supply.
- 2Boards and feedersAdd each board and size the feeder that supplies it.
- 3Areas and loadsList each area with its loads.
- 4Final circuitsGroup the loads into circuits and size each cable.
- 5OverviewThe one-line diagram with the transformer, the boards and the feeders.