المستوى العملي
المفاهيم وراء العمل الحقيقي: الطلب الأقصى، ومعاوقة الحلقة، وجداول اختيار الكابلات.
- قراءة 4 دقيقةAS/NZS 3008.1.1:2025: what the AU part coversWhat AS/NZS 3008.1.1:2025 covers, a.c. to 0.6/1 kV and d.c. to 1500 V at 40 °C air and 25 °C soil, how its sections run, and where the d.c. tables are.

- قراءة 5 دقيقةBattery classes and arc flash in AS/NZS 5139How AS/NZS 5139 classes a battery system by hazard and decisive voltage class, works its arc flash energy, and sets the PPE, consequence and home limits.

- قراءة 4 دقيقةCable tray fill: one layer, tiers and groupingHow cables lie on a tray or ladder for AS/NZS 3008.1, touching or spaced, when a run needs another tier, and why there is no fill percentage to work to.

- قراءة 5 دقيقةChecking an existing circuitThe five checks AmpSize runs on an installed circuit, from Iz and voltage drop to Zs and fault withstand, and what a site test adds that a calculation cannot.

- قراءة 4 دقيقةChoosing a comms cable: length and screenCheck a comms cable run before you order it. Length limits for RS-485 and Ethernet, the 4-20 mA loop and the screen rule, with three worked runs.

- قراءة 6 دقيقةConstruction site supplies: AS/NZS 3012What AS/NZS 3012:2019 asks of the electrical supply on a construction or demolition site, from the supply and the RCDs to cords, generators and testing.

- قراءة 4 دقيقةControl panels and PLC wiringSegregation of LV and ELV in a control panel, terminal and numbering practice, panel earthing, and the 24 V DC voltage drop that long instrument loops fail on.

- قراءة 5 دقيقةCorrection factors in the 2017 and 2025 editionsWhat each AS/NZS 3008 correction factor does, how the factors multiply, and which values changed when AS/NZS 3008.1.1:2025 replaced the 2017 tables.

- قراءة 5 دقيقةDamp situations: the Section 6 zonesHow AS/NZS 3000 Section 6 zones the space around baths, showers, basins, spas, pools, fountains and saunas, how to read an IP code, and what A2 changed.

- قراءة 5 دقيقةDC voltage drop and conductor resistanceWhy d.c. drop is 2 × I × R × L, why it has no reactance or power factor, and how the hot resistance, the cable tables, the limit and parallel cables change it.

- قراءة 3 دقيقةEarthing an outbuilding: earth or its own MENWhen a shed or sleep-out takes an earth with its submain and when it may have its own MEN link and electrode, the PEN size, and the electrode depths to use.

- قراءة 5 دقيقةGenerator sizing for motor startingWhy a motor's start, not its running load, often sets a generator's size. Running and starting kVA, voltage dip, starting methods and derating.

- قراءة 3 دقيقةIB ≤ IN ≤ IZ: the overload rule on a 32 A circuitThe overload rule is IB ≤ IN ≤ IZ. A grouped 32 A circuit fails on 6 mm² and passes on 10 mm², with an IZ of 37.6 A. Why the order matters.

- قراءة 4 دقيقةIEC 60364 and the Wiring RulesIEC 60364 is the international series that AS/NZS 3000 stays aligned with. See how its parts are numbered, what TN-C-S, TT and IT mean, and where MEN fits.

- قراءة 4 دقيقةLighting layout and the lumen methodHow many luminaires does a room need? The lumen method from target lux to a grid, worked on an 8 m by 6 m office, with the checks the tool applies.

- قراءة 5 دقيقةLoop impedance and disconnection timeZe, R1+R2, Zs and Ia, and the two disconnection times, worked on a 32 A curve C circuit over 30 m that returns 0.79 Ω against a 0.96 Ω limit.

- قراءة 4 دقيقةMaximum demand and diversityWhy consumer mains are smaller than the sum of the loads. The four methods of Cl 2.2.2, the Table C1 groups, and a house that lands on 70.18 A.

- قراءة 4 دقيقةMotor circuits and startingHow full load current sizes the cable and starting current sizes the device on a motor circuit, with a worked 22 kW 400 V motor and the cable the tool selects.

- قراءة 4 دقيقةMotor starters, contactors and overload relaysHow to choose a motor starter: locked-rotor current, star-delta, soft starters, AC-3 and AC-23 duty, the overload relay and when motor protection applies.

- قراءة 3 دقيقةMotor starting methods: current and torqueWhy a cage motor draws six or seven times full load current at start, and how star-delta, an autotransformer, a soft starter and a drive trade it for torque.

- قراءة 4 دقيقةObtrusive light and the 4282 zonesHow AS/NZS 4282 limits spill light from outdoor lighting at a neighbour's window, by environmental zone A0 to A4, curfew, intensity and upward light ratio.

- قراءة 4 دقيقةPower factor and reactive powerWhat power factor is, why a low one costs current and capacity, how a capacitor bank corrects it in steps, and when harmonics call for a detuned bank.

- قراءة 4 دقيقةPV and inverter basicsHow a grid-connected PV system connects to an installation, why voltage rise sets the inverter cable, and which standards the AmpSize tools cannot quote.

- قراءة 4 دقيقةPV array isolators and earthingHow parallel strings feed a fault, what Ithe, Ie and make and break mean for a d.c. isolator, and how AS/NZS 5033 earths and alarms a PV array.

- قراءة 3 دقيقةPV string voltage and temperatureWhy a PV string's voltage rises in the cold and falls in the heat, how AS/NZS 5033 limits it, and how the string current, fuses and isolator follow.

- قراءة 4 دقيقةRCD leakage and nuisance trippingWhy an RCD trips with no fault. Where standing leakage comes from, the one-third and one-half points of Cl 2.6.2.1, class limits against measured figures.

- قراءة 5 دقيقةRCD types and where they are requiredType AC, A, F and B, what each one detects, and the clauses that place them. The fault path behind them, worked on a 20 A circuit over 25 m.

- قراءة 4 دقيقةShort-circuit withstand and the k factorThe adiabatic check in plain terms: prospective fault current, clearing time and k, worked on 25 mm² copper XLPE at 10 kA for 0.1 s.

- قراءة 4 دقيقةTesting to Section 8: what each test provesThe Section 8 test sequence, what each test shows, and how a calculated earth fault loop impedance compares with the value a tester reads on site.

- قراءة 4 دقيقةUnderground cables and civil interfacesBurial categories, depth of cover, bedding and separation for underground cables, with a worked 100 A submain that changes size when the trench changes.

الحاسبات التي تستخدمها هذه الأدلة
- حاسبة مقاس الكابلاعثر على أصغر مقاس كابل يكون مطابقاً في كل فحص.
- حاسبة مقاس كابل DCحدّد مقاس كابل d.c. حتى 1500 V للتيار وهبوط الجهد.
- وميض القوس للبطارية وفئتهاDVC للبطارية، وفئة الخطر، وطاقة وميض القوس، ومستوى PPE.
- حاسبة البطارية الشمسيةحدّد مقاس البطارية المنزلية لحمل المساء على الطاقة الشمسية.
- حاسبة وميض القوس الكهربائيقدّر طاقة وميض القوس الكهربائي وفئة PPE.
- امتلاء حامل الكابلات والسلّمعرض حامل الكابلات أو السلّم، والطبقات، وkg/m، ومعامل التجميع.
- حاسبة معامل التصحيحاقرأ كل معامل تصحيح والقيمة الاسمية التي يحتاجها الكابل.
- فحص الدائرة القائمةتحقّق من دائرة مركّبة: الكابل، والجهاز، والهبوط، وZs.
- حاسبة معاوقة حلقة عطل التأريضتحقّق من معاوقة حلقة عطل التأريض مقارنةً بالحد الأقصى لـ Zs.
- أداة اختيار كابل الاتصالاتاختر كابل اتصالات وتحقّق من طول المسار.
- ميزانية قدرة الحلقة لحلقات 4–20 mAتحقّق من الجهد الذي تتركه حلقة 4–20 mA عند الجهاز الإرسالي.
- حاسبة تغذية موقع البناءقواعد التغذية و RCD والاختبار لموقع البناء.
- حاسبة طول السلك المرن في الموقعأطول مسار يمكن أن يمتد فيه سلك أو كابل في موقع البناء.
- فترات الاختبار ووضع البطاقاتفترات إعادة الاختبار وحدود المطابقة للمعدات المحمولة.
- تغذية المعدات المحمولة باليداقرأ قائمة ترتيبات التغذية في regs 88 إلى 89A.
- مدقق تمديدات المعارض والكرنفالاتفحوص RCD لتمديدات المعارض، مع عمق تمديدات الموقع وارتفاعها.
- حاسبة هبوط الجهداحسب هبوط الجهد على مسار الكابل وتحقّق من الحد.
- حاسبة مجموعة البطارياتاحسب سعة مجموعة البطاريات والاستقلالية لحمل معين.
- حاسبة تيار الحمل الكاملاحسب تيار الحمل الكامل من القدرة والجهد والطور.
- أداة اختيار تأريض الحجاب المعدني للكابلاعثر على موضع تأريض الحجاب المعدني أو سلك التصريف أو الدرع.
- مدقق مناطق الأماكن الرطبةحدّد المنطقة وفق Section 6 وتصنيف IP وRCD بالقرب من الماء.
- حاسبة اختيار RCDتحقّق مما إذا كان RCD مطلوباً، واختبر زمن الفصل.
- تأريض المباني الملحقةأرضِّ الكشك: تأريض مع المغذّي الفرعي، أو MEN خاص به.
- حاسبة التأريض والربطحدّد مقاس موصلات التأريض والتأريض الرئيسي والربط.
- تحديد مقاس المولّد من قائمة الأحمالحدّد مقاس المولّد من قائمة أحمال مع بدء تشغيل المحرك.
- حاسبة تيار المولّدتيار الحمل الكامل وتيار العطل للمولّد من قيمته kVA.
- حاسبة المحركحدّد تيار الحمل الكامل للمحرك وتيار البدء وعزم الدوران.
- حاسبة تحمّل الكابل لتيار العطلتحقّق من أن الموصل يتحمل تيار العطل.
- حاسبة الطلب الأقصىقدّر الطلب الأقصى للأحمال المنزلية وغير المنزلية.
- حاسبة طريقة اللومن للإضاءةعدد وحدات الإضاءة والشبكة لغرفة بطريقة اللومن.
- حاسبة القدرة ثلاثية الأطوارحوّل بين القدرة والتيار والجهد ومعامل القدرة.
- حاسبة دائرة المحركالكابل والقاطع والكونتاكتور والحمل الزائد لمحرك واحد.
- مقارنة طرق بدء تشغيل المحركقارن بدءات DOL والنجمة-المثلث والبدء الناعم والمشغّل.
- مدقق الضوء المزعجتحقّق من الإضاءة الخارجية عند نافذة على حد الملكية وفق AS/NZS 4282.
- حاسبة تصحيح معامل القدرةحدّد قدرة المكثف بوحدة kvar اللازمة لرفع معامل القدرة.
- حاسبة ارتفاع الجهداحسب ارتفاع الجهد للتوليد الموزّع أو PV.
- حاسبة مفتاح عزل PV والتأريضقيّم كابلات مصفوفة PV ومفتاح العزل للتيار المستمر والتأريض.
- حاسبة سلسلة PVالوحدات في كل سلسلة وتيار السلسلة ومفتاح العزل لـ PV.
- ميزانية التسريب الثابت لـ RCDمقدار التسريب الثابت الذي يمكن أن يحمله جهاز RCD واحد.
- فحص ترتيب RCDتحقّق من عدد الدوائر لكل RCD وتقسيم الإضاءة.
- حاسبة المحوّلاحسب تيار الحمل الكامل والمعاوقة للمحوّل.
- مدقق نتائج الاختبارتحقّق من نتائج الاختبار المقاسة مقارنةً بحدود Section 8.
- حاسبة عمق الكابل المدفونعمق الردم والفصل للكابل المدفون.
- حاسبة امتلاء الماسورةتحقّق من أن حزمة الكابلات تتسع في الماسورة.