Industrial أدلة
دوائر المحركات وتحمّل العطل وتدرّج الحماية للتركيبات الصناعية.
- قراءة 3 دقيقةGenerator fault current calculation at 400 VA 500 kVA 400 V standby set at 12 % subtransient reactance gives 721.69 A full load and 6014.07 A fault current, with the decay the figure leaves out.

- قراءة 3 دقيقةIEEE 1584-2002: arc flash model and limitsWhat the IEEE 1584-2002 empirical model governs, where it stops applying, and a 400 V switchboard study that lands on 7.54 cal/cm² at 455 mm.

- قراءة 3 دقيقةDairy shed IDMT relay setting and gradingThree IDMT relays at a 3000 A fault, two grading margins and one curve inversion between the shed main and the farm incomer, read off the AmpSize relay engine.

- قراءة 3 دقيقةDairy shed motor current: 15 kW at 400 VFull load current, shaft speed, torque and DOL starting current for a 15 kW 400 V dairy shed vacuum pump motor, worked through the AmpSize motor engine.

- قراءة 3 دقيقةIEC 60255-151: IDMT curve constantsWhat IEC 60255-151 governs, which curve sets the IDMT tool carries, and a worked grading pair on standard inverse that clears in 0.21 s and 0.74 s.

- قراءة 5 دقيقةWhat size generator for a dairy shedSize a standby set for a dairy shed from its load list. The vacuum pump's start sets the size, then staggered steps, a drive and a soft starter shrink it.

- قراءة 3 دقيقةArc flash boundary at a motor control centreArcing current, incident energy and arc flash boundary for a 400 V MCC at 25 kA with a 0.1 s clearing time, and why the equipment type moves the result.

- قراءة 5 دقيقةCable tray fill for a plant room: a second tierLay ten multicore cables on a 300 mm perforated tray in one layer, see when it takes a second tier, and carry the grouping factor into the cable size.

- قراءة 3 دقيقةMotor starting current for a 55 kW DOL startFull load current, DOL starting current, shaft speed and torque for a 55 kW four pole motor at 400 V, and what a soft starter or a VSD changes.

- قراءة 2 دقيقةIP ratings for an outdoor point and a hosed shedWhich IP code an outdoor power point, a milking shed light and a hosed switchboard need, and why an IP67 light can fail where IP65 passes.

- قراءة 3 دقيقةStarting a loaded conveyorA 22 kW conveyor that needs 120 % torque to break away. Why star-delta and a soft starter will not start it, and what a drive or autotransformer does.

- قراءة 4 دقيقةMotor circuit for a 15 kW pump: DOL or star-deltaSize a 15 kW 400 V pump circuit: cable, breaker, contactor and overload relay. Compare DOL, star-delta, soft starter and drive starts.

- قراءة 3 دقيقةTransformer secondary fault current for 500 kVAA 500 kVA 11 kV to 400 V transformer at 6 percent impedance, worked through to 721.69 A of secondary full load current and 12,028.13 A of fault current.

- قراءة 3 دقيقةFactory power factor correction: 250 kW at 0.78A 250 kW factory load at 0.78 power factor lifted to 0.95. The kvar, the capacitor steps, the current saved, the kVA released and why the bank is detuned.

- قراءة 3 دقيقةFault level at a sub‑board, 300 kVA transformerWork the prospective fault current at a sub-board 45 m from a 300 kVA transformer, three-phase and phase-earth, and check 6 kA and 10 kA breakers against it.

- قراءة 3 دقيقةArc flash incident energy at a 400 V switchboardA 400 V board with 20 kA bolted fault and 0.2 s clearing gives 6.23 cal/cm² at 455 mm, an arcing current of 9.64 kA and a 1395.97 mm boundary.

- قراءة 3 دقيقةIDMT curve grading for a 100 A feederTwo standard inverse relays at 2000 A give a feeder trip at 0.23 s, an incomer trip at 0.99 s and a grading margin of 0.76 s, read off one chart.

- قراءة 4 دقيقةAS/NZS 3008.1.2 Tables 22 to 29: deratingWhat the derating tables govern, how ambient and grouping combine into one factor, and a 63 A feeder whose capacity falls to 78.85 A on 35 mm² copper.

- قراءة 3 دقيقةAS/NZS 3008 Table 22 (now 3.33): bunched groupingAS/NZS 3008 Table 22 is the grouping table for bunched circuits, not a temperature table. The 2025 AU part calls it Table 3.33. Read it in the calculator.

- قراءة 5 دقيقةAS/NZS 3008 vs BS 7671: cable sizing comparedHow BS 7671 and AS/NZS 3000 with AS/NZS 3008.1 size a cable, where they differ, and why a BS current rating never converts into an AS/NZS one.

- قراءة 4 دقيقةAWG and the NEC for NZ and AU electriciansAWG sizes and the NEC set against AS/NZS 3000 and 3008.1. A gauge converts to mm², but its rating does not, and the NEC 3 % drop figure is only a note.

- قراءة 3 دقيقةMotor full load current: 11 kW 400 V DOLFull load current, shaft speed, torque and direct on line starting current for an 11 kW four-pole 400 V induction motor, with the figures the tool returns.

الحاسبات التي تستخدمها هذه الأدلة
- حاسبة تيار المولّدتيار الحمل الكامل وتيار العطل للمولّد من قيمته kVA.
- حاسبة وميض القوس الكهربائيقدّر طاقة وميض القوس الكهربائي وفئة PPE.
- حاسبة تدرّج IDMTارسم منحنيات فصل مرحّلات التيار الزائد ذات الزمن العكسي.
- حاسبة المحركحدّد تيار الحمل الكامل للمحرك وتيار البدء وعزم الدوران.
- تحديد مقاس المولّد من قائمة الأحمالحدّد مقاس المولّد من قائمة أحمال مع بدء تشغيل المحرك.
- امتلاء حامل الكابلات والسلّمعرض حامل الكابلات أو السلّم، والطبقات، وkg/m، ومعامل التجميع.
- مخطط تصنيف IP ومفكّك الرموزفكّ رمز IP واعثر على الأدنى المطلوب لموقع معيّن.
- مقارنة طرق بدء تشغيل المحركقارن بدءات DOL والنجمة-المثلث والبدء الناعم والمشغّل.
- حاسبة دائرة المحركالكابل والقاطع والكونتاكتور والحمل الزائد لمحرك واحد.
- حاسبة المحوّلاحسب تيار الحمل الكامل والمعاوقة للمحوّل.
- حاسبة تصحيح معامل القدرةحدّد قدرة المكثف بوحدة kvar اللازمة لرفع معامل القدرة.
- حاسبة مستوى العطلتيار العطل المتوقع عند لوحة من مصدرها.
- حاسبة مقاس الكابلاعثر على أصغر مقاس كابل يكون مطابقاً في كل فحص.
- محوّل مقاسات الكابلات الإمبرياليةحدّد القيمة الاسمية للجهاز للكابل الإمبريالي القديم.