EV charging load and spare capacity

中等级别

A drawn boards and supply schematic for EV charging load and spare capacity: supply, meter and main switchboard.

An EV charger is a large load that runs for hours. A 7 kW charger draws 32 A on one phase. A 22 kW charger draws 32 A on each of three. Most house loads come and go, but a charging car holds its current until the battery is nearly full. So the charger counts in full when you check the board.

Spare capacity

Spare capacity is the room left at the board. Take the main switch or supply rating, per phase. Take away the maximum demand of everything else on that phase. What is left is the spare capacity.

The maximum demand comes from a calculation, an assessment or a measurement. The maximum demand tool works it from Table C1 or Table C2. A logged reading over a busy week also works. Use the heaviest phase on a three‑phase board.

How the charger counts

WhereRule the EV charger tool readsCharger counts at
New Zealand, one homeTable C1 group (j)(iv)Full connected load
Australia, any installationAppendix P Paragraph P2Full rated current, every point at once
New Zealand, other installationsAppendix P Paragraph P2Full rated current, every point at once

Table C1 group (j)(iv) also has columns for blocks of living units, where communal chargers count at 100 %, 90 % or 75 % by the number of units. The EV charger tool reads the single installation column.

Clause 2.2.1.4 points to Appendix P for EV charging circuits, and to Clause 7.9 for New Zealand. Appendix P is informative: its paragraphs are guidance.

Single‑phase chargers on a three‑phase board

Spread single‑phase chargers over the three phases. The heaviest phase then carries the most chargers. Four chargers on three phases put two on one phase, so that phase carries 64 A. The EV charger tool assumes an even spread and checks the heaviest phase.

A three‑phase charger loads every phase. Four 22 kW chargers put 128 A on each phase.

Load management

A load management device measures the main and sets the charger current to the room that is left. With a limit of 20 A, a 32 A charger takes at most 20 A on a busy evening.

The EV charger tool shows two cases with load management on. The unmanaged case counts every charger at full current, as the demand rules do. The managed case counts the device limit. Keep both: the managed case holds only while the device works and stays set.

A NOTE to Clause 7.9.3.3(a) names mains upgrades and load management for New Zealand chargers above 20 A single‑phase. A NOTE is guidance, not a clause requirement.

The cable

A charger circuit is a final subcircuit like any other: size it for the current, the run and the installation method. In a New Zealand home, Clause 7.9.3.3 prints a 32 A capacity for a single‑phase Mode 3 or Mode 4 circuit. So size for 32 A even where the charger runs lower. The EV charger tool does this, and sends the run through the cable size tool's engine.

The residual current device

WhereDevice the tool names
New Zealand, Mode 3 and Mode 4Separate 30 mA Type B in every live conductor. For Mode 3, Type A with an RDC-DD is the alternative
Australia, every charging point30 mA, at least Type A, one per point, in every live conductor
Australia, Mode 3 and Mode 4 outletsType B, or Type A with 6 mA d.c. detection, unless the charger has it

A charger's d.c. fault current can blind a Type A device. Type B devices detect smooth d.c. as well. A 6 mA d.c. detector in the charger, or beside a Type A device, is the other route. The RCD types learn page explains the types.

Worked example

EV charger spare capacity on a 63 A main switch works one house: 23 A spare, a 32 A charger 9 A short, and three ways to close the gap.