电气认证路径
查找新西兰或澳大利亚工程所需的文件。
Reads Electricity (Safety) Regulations 2010. Tables checked 26 Sept 2026.
尝试一个工程 12
每项工作都会预填示例数值。请替换为您自己的数值。
- Find the paperwork for a home solar jobThe work category and the certificates a home PV alteration needs in NZ.
- Find the paperwork for a job in NSWThe CCEW, the eCert portal and the 7 day deadline.
- Find the paperwork for a job in VictoriaThe certificate of electrical safety, where it goes and when.
- Find the paperwork for a job in QueenslandThe certificate of testing and compliance and how long to keep it.
- Find the notices for a job in WAThe preliminary notice, the completion notice and the safety certificate.
- Find the paperwork for a new houseThe certificates a new domestic installation needs.
- Find the paperwork for a like-for-like repairThe category of a replacement in an existing installation.
- Find what a homeowner may doThe limits on a homeowner's own wiring work.
- Find the paperwork for mains workThe inspection mains work needs.
- Find the paperwork for a hazardous areaThe category and inspection for a hazardous area job.
- Find the paperwork for a medical fit-outThe category and inspection for a patient area.
- Find the paperwork for a generator connectionThe category for mains-parallel generation.
输入
使用默认输入值的示例计算。
- 管辖区
- 新西兰
- 工作
- 新装设施或新末端分路
- 由谁完成工作
- 持证电气工作人员
- 住宅安装
- 是
- 相
- 单相
- 每相最大需量
- 60 A
- 市电相关工作
- 否
- 光伏系统
- 否
- 与市电并联发电
- 否
- 高压装置
- 否
- 危险区域
- 否
- 医用电气设备
- 否
- 不符合 AS/NZS 3000 第 2 部分
- 否
工作类别
General prescribed electrical work
- 已列出合规证书
- 是
- 列出的检查记录
- 否
- 电气安全证书(如已签发)
- 接线后 20 个工作日
- 本装置的标准 reg 59 名称
- AS/NZS 3000 第 2 部分
- reg 57 需量阈值,每相
- 80A
- 对照 reg 57 阈值的负荷
- The demand entered, 60 A per phase, is at or below the reg 57(2) threshold of 80 A per phase.
此结果仅供设计参考。请对照现行标准进行核验。
计算步骤
- 工作类别general
Electricity (Safety) Regulations 2010 reg 6A
- 已列出合规证书是
Electricity (Safety) Regulations 2010 reg 65
- 已列出的检验记录否
Electricity (Safety) Regulations 2010 reg 70
- 电气安全证书(如已签发),接电后的工作日数20
Electricity (Safety) Regulations 2010 reg 74C
- 合规证书副本,工程完成后天数20
Electricity (Safety) Regulations 2010 reg 74E
- 合规证书保存年限7
Electricity (Safety) Regulations 2010 reg 74E
- 本装置的标准 reg 59 名称AS/NZS 3000 第 2 部分
Electricity (Safety) Regulations 2010 reg 59
- 每相房主负荷阈值80A
Electricity (Safety) Regulations 2010 reg 57
- 按 reg 57 阈值录入的负荷The demand entered, 60 A per phase, is at or below the reg 57(2) threshold of 80 A per phase.
Electricity (Safety) Regulations 2010 reg 57
关于此计算器
How this is calculated
The tool points to the New Zealand regulation that applies to a job. It reads the Electricity (Safety) Regulations 2010. It does not read a Standard.
- Work category. The tool reads the work type and who does it. It names the category of work, such as general prescribed electrical work (reg 6A).
- Certificate of compliance. It says whether the work needs a certificate of compliance (reg 65).
- Record of inspection. It says whether the work needs a record of inspection (reg 70).
- Timing. It gives the days to issue an electrical safety certificate after connection (reg 74C). It gives the days to send a copy of the certificate of compliance. It also gives how long to keep it (reg 74E).
- Standard. It names the Standard that reg 59 sets for this installation.
- Homeowner threshold. For a homeowner, it compares your demand per phase with the reg 57 threshold.
| Step | Table or clause | What it decides |
|---|---|---|
| Category | Reg 6A | The class of the work |
| Certificate of compliance | Reg 65 | Whether one is listed |
| Record of inspection | Reg 70 | Whether one is listed |
| Safety certificate and copy | Regs 74C and 74E | The days and the retention |
| Standard | Reg 59 | The Standard for the installation |
| Homeowner demand | Reg 57 | The threshold per phase |
Australia
Choose a state or territory. The tool does not sort the work into a class. It gives the paperwork rule from the regulator's own page: the certificate, who signs it, where it goes, the deadline, who gets a copy and how long to keep it. It also links the licence register.
Each line names the regulator page and the date AmpSize read it. A line not yet read on that page says "Confirm with your regulator". AmpSize reads these pages again every quarter.
Worked example
- New installation by a licensed person, single phase, 60 A. The tool names general prescribed electrical work. A certificate of compliance is listed and a record of inspection is not. The demand is below the 80 A per phase threshold.
- Paperwork in Victoria. The tool names the Certificate of Electrical Safety, ESVConnect and the 16 day period for prescribed work.
Limits
- The tool points at the regulation. It is not a ruling and it is not advice. Read the current reprint.
- Regs 74A and 74B say which work a safety certificate covers. The tool names the timing only.
- Reg 74E(2A) covers a small stand-alone dwelling that has no consent. It states no period for the copy.
- The work classes are New Zealand law. For Australia the tool gives the paperwork rows only.
See also: Electricity Safety Regulations reg 57 and 59, Who may do electrical work in NZ and Test and tag.
问题
结果仅供设计参考。请依据现行标准核对。
本工具是法律意见吗?
否。本工具仅供参考,不构成裁定。它指明列出该工作的法规,并报告该法规所载的数据。它不告诉您可以做什么。请阅读现行版本的法规重印本,并咨询 WorkSafe 或持证检查员。
工具会报告什么?
依据 regulation 6A 的工作类别;regulation 65 是否列出合规证书;regulation 70 是否列出检查记录;regulation 74C 的 20 个工作日期限;以及 regulations 57 和 59 的需量阈值。
它采用哪个版本的法规?
版本为截至 2026 年 1 月 15 日的版本。本工具报告的数据与 2016 年 4 月 4 日的重印本相同。依赖任何结果之前,请在新西兰立法网站上查看是否有更新版本。
是否涵盖澳大利亚?
是的,用于文书工作。选择州或领地。工具给出证书、提交位置、期限、副本、保存及执照登记册。每行注明监管机构页面及 AmpSize 读取该内容的日期。尚未读取的行显示“请与您的监管机构确认”。
计算示例
背景
本工具读取的条款和表格
- Electricity (Safety) Regulations 2010 reg 6ALow-risk, high-risk and general prescribed electrical work
- Electricity (Safety) Regulations 2010 reg 57Exemption for domestic electrical wiring work
- Electricity (Safety) Regulations 2010 reg 70Record of inspection
- reg 57, 59, 65, 74C, 74EThresholds and periods for prescribed electrical work
表格最后核对于 26 Sept 2026。
相关工具
- 配电箱测试记录表Print a board test sheet with the limit for each test.AS/NZS 3017AS/NZS 3000Electricity (Safety) Regulations 2010
- 电缆截面计算器Find the smallest cable size that passes each check.AS/NZS 3008.1.2AS/NZS 3008.1.1AS/NZS 3000
- 最大需量计算器Estimate maximum demand for domestic or non‑domestic loads.AS/NZS 3000 Table C1/C2
这是否有用?
有问题,或数值看起来有误?联系我们。