Pathway ng electrical certification
Hanapin ang mga papeles para sa trabaho sa NZ o Australia.
Reads Electricity (Safety) Regulations 2010. Tables checked 26 Sept 2026.
Subukan ang isang job 12
Nilalagyan ng halimbawang value ang bawat job. Palitan ang mga ito ng sarili mong value.
- Find the paperwork for a home solar jobThe work category and the certificates a home PV alteration needs in NZ.
- Find the paperwork for a job in NSWThe CCEW, the eCert portal and the 7 day deadline.
- Find the paperwork for a job in VictoriaThe certificate of electrical safety, where it goes and when.
- Find the paperwork for a job in QueenslandThe certificate of testing and compliance and how long to keep it.
- Find the notices for a job in WAThe preliminary notice, the completion notice and the safety certificate.
- Find the paperwork for a new houseThe certificates a new domestic installation needs.
- Find the paperwork for a like-for-like repairThe category of a replacement in an existing installation.
- Find what a homeowner may doThe limits on a homeowner's own wiring work.
- Find the paperwork for mains workThe inspection mains work needs.
- Find the paperwork for a hazardous areaThe category and inspection for a hazardous area job.
- Find the paperwork for a medical fit-outThe category and inspection for a patient area.
- Find the paperwork for a generator connectionThe category for mains-parallel generation.
Mga input
Worked example gamit ang mga default na input.
- Hurisdiksyon
- New Zealand
- Trabaho
- Bagong installation o bagong subcircuit
- Sino ang gumagawa ng trabaho
- Lisensyadong electrical worker
- Pang-tahanang installation
- Oo
- Mga phase
- Single phase
- Pinakamataas na demand kada phase
- 60 A
- Trabaho sa mains
- Hindi
- Photovoltaic system
- Hindi
- Mains parallel generation
- Hindi
- High voltage installation
- Hindi
- Hazardous area
- Hindi
- Mga electrical medical device
- Hindi
- Hindi sumusunod sa Part 2 ng AS/NZS 3000
- Hindi
Kategorya ng gawain
General prescribed electrical work
- Nakalista ang certificate of compliance
- Oo
- Nakalista ang record of inspection
- Hindi
- Electrical safety certificate, kung may inilalabas
- 20 na working day pagkatapos ng connection
- Pangalan ng standard reg 59 para sa installation na ito
- Part 2 ng AS/NZS 3000
- Demand threshold ng reg 57, kada phase
- 80A
- Demand laban sa threshold ng reg 57
- The demand entered, 60 A per phase, is at or below the reg 57(2) threshold of 80 A per phase.
Design aid lang ang resultang ito. I-verify ito laban sa kasalukuyang standard.
Mga hakbang ng kalkulasyon
- Kategorya ng trabahogeneral
Electricity (Safety) Regulations 2010 reg 6A
- Nakalista ang certificate of complianceOo
Electricity (Safety) Regulations 2010 reg 65
- Nakalistang talaan ng inspeksyonHindi
Electricity (Safety) Regulations 2010 reg 70
- Electrical safety certificate, kung may inilabas, mga araw ng trabaho pagkatapos ng koneksyon20
Electricity (Safety) Regulations 2010 reg 74C
- Kopya ng certificate of compliance, mga araw matapos ang trabaho20
Electricity (Safety) Regulations 2010 reg 74E
- Panahon ng pag-iingat ng certificate of compliance, taon7
Electricity (Safety) Regulations 2010 reg 74E
- Pangalan ng standard reg 59 para sa installation na itoPart 2 ng AS/NZS 3000
Electricity (Safety) Regulations 2010 reg 59
- Threshold ng demand ng may-ari ng bahay, kada phase80A
Electricity (Safety) Regulations 2010 reg 57
- Demand na inilagay laban sa reg 57 thresholdThe demand entered, 60 A per phase, is at or below the reg 57(2) threshold of 80 A per phase.
Electricity (Safety) Regulations 2010 reg 57
Tungkol sa calculator na ito
How this is calculated
The tool points to the New Zealand regulation that applies to a job. It reads the Electricity (Safety) Regulations 2010. It does not read a Standard.
- Work category. The tool reads the work type and who does it. It names the category of work, such as general prescribed electrical work (reg 6A).
- Certificate of compliance. It says whether the work needs a certificate of compliance (reg 65).
- Record of inspection. It says whether the work needs a record of inspection (reg 70).
- Timing. It gives the days to issue an electrical safety certificate after connection (reg 74C). It gives the days to send a copy of the certificate of compliance. It also gives how long to keep it (reg 74E).
- Standard. It names the Standard that reg 59 sets for this installation.
- Homeowner threshold. For a homeowner, it compares your demand per phase with the reg 57 threshold.
| Step | Table or clause | What it decides |
|---|---|---|
| Category | Reg 6A | The class of the work |
| Certificate of compliance | Reg 65 | Whether one is listed |
| Record of inspection | Reg 70 | Whether one is listed |
| Safety certificate and copy | Regs 74C and 74E | The days and the retention |
| Standard | Reg 59 | The Standard for the installation |
| Homeowner demand | Reg 57 | The threshold per phase |
Australia
Choose a state or territory. The tool does not sort the work into a class. It gives the paperwork rule from the regulator's own page: the certificate, who signs it, where it goes, the deadline, who gets a copy and how long to keep it. It also links the licence register.
Each line names the regulator page and the date AmpSize read it. A line not yet read on that page says "Confirm with your regulator". AmpSize reads these pages again every quarter.
Worked example
- New installation by a licensed person, single phase, 60 A. The tool names general prescribed electrical work. A certificate of compliance is listed and a record of inspection is not. The demand is below the 80 A per phase threshold.
- Paperwork in Victoria. The tool names the Certificate of Electrical Safety, ESVConnect and the 16 day period for prescribed work.
Limits
- The tool points at the regulation. It is not a ruling and it is not advice. Read the current reprint.
- Regs 74A and 74B say which work a safety certificate covers. The tool names the timing only.
- Reg 74E(2A) covers a small stand-alone dwelling that has no consent. It states no period for the copy.
- The work classes are New Zealand law. For Australia the tool gives the paperwork rows only.
See also: Electricity Safety Regulations reg 57 and 59, Who may do electrical work in NZ and Test and tag.
Mga tanong
Design aid ang resulta. I-verify ito laban sa kasalukuyang standard.
Legal advice ba ang tool na ito?
Hindi. Gabay ang tool, hindi desisyon. Tinutukoy nito ang regulation na naglilista ng trabaho at iniuulat ang mga numerong dala ng regulation na iyon. Hindi nito sinasabi kung ano ang puwede mong gawin. Basahin ang kasalukuyang reprint ng regulations at magtanong sa WorkSafe o sa lisensiyadong inspector.
Ano ang iniuulat ng tool?
Ang work category sa ilalim ng regulation 6A, kung nakalista sa regulation 65 ang certificate of compliance, kung nakalista sa regulation 70 ang record of inspection, ang 20 working day period ng regulation 74C, at ang demand threshold ng regulations 57 at 59.
Aling edition ng regulations ang ginagamit nito?
Ang bersyon na nasa 15 January 2026. Pareho ang mga figure na iniuulat ng tool sa 4 April 2016 reprint. Tingnan kung may mas bagong bersyon sa website ng New Zealand legislation bago ka umasa sa anumang resulta.
Sakop ba nito ang Australia?
Oo, para sa mga papeles. Pumili ng state o territory. Ibinibigay ng tool ang certificate, saan ito ilalagay, ang deadline, mga kopya, retention at licence register. Binabanggit ng bawat linya ang regulator page at ang petsang binasa ito ng AmpSize. Ang linyang hindi pa nababasa ay nagsasabing “Kumpirmahin sa regulator mo”.
Background
Mga clause at table na binabasa ng tool na ito
- Electricity (Safety) Regulations 2010 reg 6ALow-risk, high-risk and general prescribed electrical work
- Electricity (Safety) Regulations 2010 reg 57Exemption for domestic electrical wiring work
- Electricity (Safety) Regulations 2010 reg 70Record of inspection
- reg 57, 59, 65, 74C, 74EThresholds and periods for prescribed electrical work
Bawat clause at table, kasama kung paano ito na-verify
Huling na-check ang mga table noong 26 Sept 2026.
Mga kaugnay na tool
- Test schedule para sa switchboardPrint a board test sheet with the limit for each test.AS/NZS 3017AS/NZS 3000Electricity (Safety) Regulations 2010
- Cable size calculatorFind the smallest cable size that passes each check.AS/NZS 3008.1.2AS/NZS 3008.1.1AS/NZS 3000
- Maximum demand calculatorEstimate maximum demand for domestic or non‑domestic loads.AS/NZS 3000 Table C1/C2