Lumaktaw sa nilalaman
AmpSize

Pathway ng electrical certification

Hanapin ang mga papeles para sa trabaho sa NZ o Australia.

Reads Electricity (Safety) Regulations 2010. Tables checked 26 Sept 2026.

Mga input

Worked example gamit ang mga default na input.

Hurisdiksyon
New Zealand
Trabaho
Bagong installation o bagong subcircuit
Sino ang gumagawa ng trabaho
Lisensyadong electrical worker
Pang-tahanang installation
Oo
Mga phase
Single phase
Pinakamataas na demand kada phase
60 A
Trabaho sa mains
Hindi
Photovoltaic system
Hindi
Mains parallel generation
Hindi
High voltage installation
Hindi
Hazardous area
Hindi
Mga electrical medical device
Hindi
Hindi sumusunod sa Part 2 ng AS/NZS 3000
Hindi

Kategorya ng gawain

General prescribed electrical work

Nakalista ang certificate of compliance
Oo
Nakalista ang record of inspection
Hindi
Electrical safety certificate, kung may inilalabas
20 na working day pagkatapos ng connection
Pangalan ng standard reg 59 para sa installation na ito
Part 2 ng AS/NZS 3000
Demand threshold ng reg 57, kada phase
80A
Demand laban sa threshold ng reg 57
The demand entered, 60 A per phase, is at or below the reg 57(2) threshold of 80 A per phase.

Design aid lang ang resultang ito. I-verify ito laban sa kasalukuyang standard.

Mga hakbang ng kalkulasyon

  1. Kategorya ng trabahogeneral

    Electricity (Safety) Regulations 2010 reg 6A

  2. Nakalista ang certificate of complianceOo

    Electricity (Safety) Regulations 2010 reg 65

  3. Nakalistang talaan ng inspeksyonHindi

    Electricity (Safety) Regulations 2010 reg 70

  4. Electrical safety certificate, kung may inilabas, mga araw ng trabaho pagkatapos ng koneksyon20

    Electricity (Safety) Regulations 2010 reg 74C

  5. Kopya ng certificate of compliance, mga araw matapos ang trabaho20

    Electricity (Safety) Regulations 2010 reg 74E

  6. Panahon ng pag-iingat ng certificate of compliance, taon7

    Electricity (Safety) Regulations 2010 reg 74E

  7. Pangalan ng standard reg 59 para sa installation na itoPart 2 ng AS/NZS 3000

    Electricity (Safety) Regulations 2010 reg 59

  8. Threshold ng demand ng may-ari ng bahay, kada phase80A

    Electricity (Safety) Regulations 2010 reg 57

  9. Demand na inilagay laban sa reg 57 thresholdThe demand entered, 60 A per phase, is at or below the reg 57(2) threshold of 80 A per phase.

    Electricity (Safety) Regulations 2010 reg 57

Tungkol sa calculator na ito

How this is calculated

The tool points to the New Zealand regulation that applies to a job. It reads the Electricity (Safety) Regulations 2010. It does not read a Standard.

  1. Work category. The tool reads the work type and who does it. It names the category of work, such as general prescribed electrical work (reg 6A).
  2. Certificate of compliance. It says whether the work needs a certificate of compliance (reg 65).
  3. Record of inspection. It says whether the work needs a record of inspection (reg 70).
  4. Timing. It gives the days to issue an electrical safety certificate after connection (reg 74C). It gives the days to send a copy of the certificate of compliance. It also gives how long to keep it (reg 74E).
  5. Standard. It names the Standard that reg 59 sets for this installation.
  6. Homeowner threshold. For a homeowner, it compares your demand per phase with the reg 57 threshold.
StepTable or clauseWhat it decides
CategoryReg 6AThe class of the work
Certificate of complianceReg 65Whether one is listed
Record of inspectionReg 70Whether one is listed
Safety certificate and copyRegs 74C and 74EThe days and the retention
StandardReg 59The Standard for the installation
Homeowner demandReg 57The threshold per phase

Australia

Choose a state or territory. The tool does not sort the work into a class. It gives the paperwork rule from the regulator's own page: the certificate, who signs it, where it goes, the deadline, who gets a copy and how long to keep it. It also links the licence register.

Each line names the regulator page and the date AmpSize read it. A line not yet read on that page says "Confirm with your regulator". AmpSize reads these pages again every quarter.

Worked example

Limits

  • The tool points at the regulation. It is not a ruling and it is not advice. Read the current reprint.
  • Regs 74A and 74B say which work a safety certificate covers. The tool names the timing only.
  • Reg 74E(2A) covers a small stand-alone dwelling that has no consent. It states no period for the copy.
  • The work classes are New Zealand law. For Australia the tool gives the paperwork rows only.

See also: Electricity Safety Regulations reg 57 and 59, Who may do electrical work in NZ and Test and tag.

Mga tanong

Design aid ang resulta. I-verify ito laban sa kasalukuyang standard.

Legal advice ba ang tool na ito?

Hindi. Gabay ang tool, hindi desisyon. Tinutukoy nito ang regulation na naglilista ng trabaho at iniuulat ang mga numerong dala ng regulation na iyon. Hindi nito sinasabi kung ano ang puwede mong gawin. Basahin ang kasalukuyang reprint ng regulations at magtanong sa WorkSafe o sa lisensiyadong inspector.

Ano ang iniuulat ng tool?

Ang work category sa ilalim ng regulation 6A, kung nakalista sa regulation 65 ang certificate of compliance, kung nakalista sa regulation 70 ang record of inspection, ang 20 working day period ng regulation 74C, at ang demand threshold ng regulations 57 at 59.

Aling edition ng regulations ang ginagamit nito?

Ang bersyon na nasa 15 January 2026. Pareho ang mga figure na iniuulat ng tool sa 4 April 2016 reprint. Tingnan kung may mas bagong bersyon sa website ng New Zealand legislation bago ka umasa sa anumang resulta.

Sakop ba nito ang Australia?

Oo, para sa mga papeles. Pumili ng state o territory. Ibinibigay ng tool ang certificate, saan ito ilalagay, ang deadline, mga kopya, retention at licence register. Binabanggit ng bawat linya ang regulator page at ang petsang binasa ito ng AmpSize. Ang linyang hindi pa nababasa ay nagsasabing “Kumpirmahin sa regulator mo”.

Background

Mga clause at table na binabasa ng tool na ito

Bawat clause at table, kasama kung paano ito na-verify

Huling na-check ang mga table noong 26 Sept 2026.

Nakatulong ba ito?

May tanong, o may value na mukhang mali? Makipag-ugnayan sa amin.