跨配电箱的负荷表
依据配电箱同时系数,计算场地各配电箱的最大需量。
Reads AS/NZS 3000:2018. Tables checked 26 Sept 2026.
尝试一个工程 4
每项工作都会预填示例数值。请替换为您自己的数值。
- Schedule a workshop site with four boardsThe demand of a main board, two boards and a mezzanine board by Table C4.
- Demand of a house with a garage boardThe single‑phase demand of a house board feeding a garage board.
- Check a submain device against its boardWhether a 160 A submain device covers a busy board of 14 circuits.
- Site demand for a supply applicationThe site demand in kVA of a shop with a main board and two boards.
输入
使用默认输入值的示例计算。
- 相
- 三相
- 电压
- 400 V
- 配电盘,主配电盘优先
- 3 行
- 配电盘符合 AS/NZS 61439 或 AS/NZS 3439
- 是
每相需量
325.5A
- 现场最大需量
- 225.5kVA
- 总配电板的额定值之和
- 465A
- 配电箱
- 3
此结果仅供设计参考。请对照现行标准进行核验。
计算步骤
- MSB:8 个装置,额定值合计 465 A×0.70
AS/NZS 3000:2018 Table C4
- MSB:需求量325.5A
AS/NZS 3000:2018 App C Para C2.4.4
- DB1:12 个装置,额定值合计 260 A×0.60
AS/NZS 3000:2018 Table C4
- DB1:需求量156A
AS/NZS 3000:2018 App C Para C2.4.4
- DB2:8 个装置,额定值合计 150 A×0.70
AS/NZS 3000:2018 Table C4
- DB2:需求量105A
AS/NZS 3000:2018 App C Para C2.4.4
- 每相需量结果325.5A
AS/NZS 3000:2018 App C Para C2.4.4
- 现场最大需量225.5kVA
关于此计算器
How this is calculated
A load schedule lists the boards of a site and what each one draws. The tool works the maximum demand of each board by the switchboard diversity method of AS/NZS 3000 Appendix C, and carries it up the tree to the main board.
Para C2.4.4 sets the method for switchboards that conform to the AS/NZS 3439 or AS/NZS 61439 series. The maximum demand of a board is the sum of the overload ratings of its circuits, times a factor from Table C4. The factor falls as the number of circuit protective devices downstream rises.
On each board the tool counts its final subcircuit devices and one device for each submain it feeds. It adds the ratings of the final subcircuits and the rating of each submain device. The submain is a circuit of the board that feeds it, so a sub‑board's demand is never added twice. Table C4 prints no factor below two devices, and the tool then takes the sum as the demand.
The ratings are per phase. On a three‑phase board, enter the sum on the most loaded phase, and count a three‑pole device once. The tool gives each board's demand in amps and in kVA, and the site's demand at the main board.
Each sub‑board's demand is checked against the device that feeds it. A board whose demand is more than its submain device gets a warning.
The schedule prints as a sheet with one row a board.
| Step | Table or clause | What it decides |
|---|---|---|
| Devices on a board | Final subcircuits plus one a submain | The count Table C4 is read at |
| Sum of ratings | Para C2.4.4 | The circuits' ratings plus each submain device's rating |
| Diversity factor | Table C4 | The factor for the number of devices |
| Board demand | Para C2.4.4 | The sum times the factor |
| Submain check | The demand against the feeding device | Whether a submain device is smaller than its board's demand |
Worked examples
- A workshop site with four boards has a site maximum demand of 283.5 A a phase, 196.4 kVA. The main board's ratings add to 405 A.
- A house with a garage board has a maximum demand of 149.1 A, 34.3 kVA. The main board's ratings add to 213 A.
- A main board feeding one busy board has a site maximum demand of 200 A a phase, 138.6 kVA. The main board's ratings add to 250 A. The busy board's demand of 192 A is more than its 160 A submain device.
- A main board and two distribution boards has a site maximum demand of 325.5 A a phase, 225.5 kVA. The main board's ratings add to 465 A.
Limits
The method is only for boards that conform to the AS/NZS 3439 or AS/NZS 61439 series. For other boards, use another Appendix C method, such as the maximum demand tool. With the toggle off, the tool takes no Table C4 factor and gives the sum of the ratings.
It works from device ratings, not from the loads. A board full of large devices with small loads gives a high demand. A load-by-load assessment can give a lower figure.
See also: Maximum demand, Circuit loading and Max demand by phase.
问题
结果仅供设计参考。请依据现行标准核对。
如何求出配电箱的最大需量?
依据 AS/NZS 3000 Para C2.4.4,将配电箱各回路的过载额定值相加,再乘以 Table C4 中对应设备数量的系数:2 或 3 个为 0.9,4 或 5 个为 0.8,6 至 9 个为 0.7,10 个或以上为 0.6。
分配电箱如何计算?
分支干线是向其所在配电箱供电的回路。本工具将其计为该配电箱上的一个保护装置,并按其保护装置额定值计算。因此分配电箱的需量不会在其上级配电箱中被重复计入。
该方法适用于哪些配电箱?
Para C2.4.4 适用于符合 AS/NZS 3439 或 AS/NZS 61439 系列的配电箱。对于其他配电箱,请使用Appendix C 的其他方法,例如 Table C1 或 C2 的负荷组。
若配电箱需量超过分支干线保护装置,该怎么办?
工具会发出警告。为配电箱供电的保护装置将小于该方法给出的需量。请检查配电箱上的装置、电缆及负荷。
如何录入三相配电箱?
输入负荷最重一相上各额定值之和,三极装置只计一次。本工具按您设定的电压,给出每相需量及以 kVA 表示的需量。
本工具读取的条款和表格
- AS/NZS 3000:2018 App C Para C2.4.4Maximum demand by switchboard diversity
- AS/NZS 3000:2018 Table C4Upstream circuit loading after diversity
表格最后核对于 26 Sept 2026。
相关工具
这是否有用?
有问题,或数值看起来有误?联系我们。