Electricity (Safety) Regulations 2010
reg 75
Periodic assessment intervals for special installations
The assessment interval tool reads one row per installation reg 75(1) names: the paragraph, the interval in years where the paragraph states one, the standard the assessment is made against, the subclause that names the assessor, and the record period. A null interval means the paragraph states none, and the tool says so in words.
已核验:对照印刷版标准阅读,页码 76–77。检查于 26 Sept 2026。
单位:Interval years years, Record years years
这些是 AmpSize 所编码的数值。不转载标准原文。请依据现行标准核对。
7 行
| Installation | Paragraph | Interval years | Standard | Assessor subclause |
|---|---|---|---|---|
| caravan-park | reg 75(1)(a) | 5 | AS/NZS 3001.1 | 75(2) |
| boat-marina | reg 75(1)(b) | 5 | AS/NZS 3004.1 | 75(2) |
| construction-demolition | reg 75(1)(c) | — | AS/NZS 3012 | 75(2) |
| carnival-fairground | reg 75(1)(d) | 1 | AS/NZS 3002 | 75(3) |
| hazardous-area | reg 75(1)(e) | — | AS/NZS 60079.17 | 75(3) |
| medical-mobile | reg 75(1)(f)(i) | — | NZS 6115 | 75(3) |
| medical-other | reg 75(1)(f)(ii) | — | AS/NZS 3003 | 75(3) |