跳至内容
AmpSize

根据负荷清单进行发电机选型

根据负荷清单(含电动机启动)为发电机选型。

无标准

输入

使用默认输入值的示例计算。

相
三相
电压
400 V
负荷及各自的起动级
2 行
允许的最大电压跌落
15 %
次暂态电抗
15 %
额定功率因数
0.8
海拔和高温降容
0 %

发电机额定值,至少

50kVA

运行负载
19.05kVA
规格取决于
启动步骤 2
该规格下的最大电压降
15%
该规格下的满载电流
72.17A
该规格下的故障电流
481.13A

此结果仅供设计参考。请对照现行标准进行核验。

计算步骤

  1. 负荷 1:10 kW,第 1 步10kVA
  2. 负荷 2:7.5 kW 电机,直接启动,第 2 步运行 9.8 kVA,启动 58.82 kVA
  3. 运行有功功率18.33kW
  4. 运行无功功率5.16kvar
  5. 运行负载19.05kVA
  6. 运行负荷所需的最小 kVA 设定值22.92kVA
  7. 第 1 步:按 15 % 电压骤降设定 kVA8.5kVA
  8. 第 2 步:按 15 % 电压骤降设定 kVA结果50kVA
  9. 规格设定方式启动步骤 2
  10. 该规格下的最大电压降15%
  11. 该规格下的满载电流72.17A
  12. 该规格下的故障电流481.13A

关于此计算器

How this is calculated

A generator has to do two things. It has to carry the running load, and it has to hold its voltage when a large load starts. A small set can run a pump but still dip so far as the pump starts that lights flicker and contactors drop out. This tool works both and gives the larger as the size.

You list the loads with the power each draws, its power factor and the step it starts in. Loads in the same step start together. For the running load the tool adds the real power and the reactive power of every load, then takes the kVA from both. Loads at different power factors do not add as kVA. The set must also give the real power at its own rated power factor, which is often 0.8.

A motor draws more than its running current as it starts. The tool takes the motor's running kVA from the motor tool's full load current, then multiplies it by the start: six for direct on line, a third of that for star-delta, the multiple you enter for a soft starter, and one for a variable speed drive. For each step the tool finds the smallest set whose reactance keeps the dip within the limit you set. The largest need, running or starting, divided by what is left after any reduction for altitude and heat, is the size. The generator tool then gives the full load current and fault current of a set at that rating.

AmpSize holds no generator standard. The dip limit, the reactance and the soft starter multiple are inputs, and the result says so.

StepTable or clauseWhat it decides
Running loadP and Q added, kVA from bothThe set kVA for the running load
Rated power factorSet kW = kVA × rated pfThe set kVA for the running kW
Motor starting kVAThe motor tool's full load current × the start multipleThe kVA each step draws as it starts
Voltage dipDip = x × step kVA ÷ (set kVA + x × step kVA)The set kVA for each step
Altitude and heatSize ÷ (1 − the reduction)The rating to buy
Current and fault levelThe generator toolThe full load current and fault current at that rating

Worked examples

Limits

The dip is worked from the set's subtransient reactance alone. It leaves out the voltage regulator's recovery, the engine's speed dip, and loads already running, which a maker's sizing program models. Use the size as a first pick, then check it on the maker's data.

The tool does not cover a set in parallel with the network, a non‑linear load's effect on the alternator, or the installation rules for a generating set.

See also: Generator, Motor and Maximum demand.

问题

结果仅供设计参考。请依据现行标准核对。

如何为电动机进行发电机选型?

电动机启动时的电流为其运行电流的数倍,机组电压随之跌落。本工具计算每一步的启动 kVA,以及使跌落保持在您所设限值内的机组容量。

为何运行负荷不是简单地将千伏安相加?

不同功率因数的负荷按有功功率和无功功率分别相加。工具将 kW 和 kvar 相加,然后由两者求得 kVA。该设备组还必须给出其额定功率因数下的 kW,通常为 0.8。

应允许多大的电压跌落?

这取决于负荷。照明在较小的电压跌落时即会闪烁,而电动机可以承受较大的跌落,接触器则可能在较大跌落时释放。AmpSize 未收录发电机标准来设定该限值,因此需由您输入。

采用软启动器或变频器后,机组可以小多少?

启动千伏安随启动电流降低。星-三角启动为直接启动的三分之一。软启动器按您输入的倍数启动,变频器则接近其运行电流启动。

是否计入海拔和高温的影响?

以百分比输入制造商的降容值。本工具用所需规格除以剩余百分比。同时,它依据发电机工具,给出该额定值下机组的满载电流和故障电流。

计算示例

背景

这是否有用?

有问题,或数值看起来有误?联系我们。