المسار التنظيمي للشهادات الكهربائية
حدّد المستندات اللازمة لعمل في NZ أو أستراليا.
Reads Electricity (Safety) Regulations 2010. Tables checked 26 Sept 2026.
جرّب مشروعاً 12
تملأ كل مهمة قيماً توضيحية. استبدلها بقيمك.
- Find the paperwork for a home solar jobThe work category and the certificates a home PV alteration needs in NZ.
- Find the paperwork for a job in NSWThe CCEW, the eCert portal and the 7 day deadline.
- Find the paperwork for a job in VictoriaThe certificate of electrical safety, where it goes and when.
- Find the paperwork for a job in QueenslandThe certificate of testing and compliance and how long to keep it.
- Find the notices for a job in WAThe preliminary notice, the completion notice and the safety certificate.
- Find the paperwork for a new houseThe certificates a new domestic installation needs.
- Find the paperwork for a like-for-like repairThe category of a replacement in an existing installation.
- Find what a homeowner may doThe limits on a homeowner's own wiring work.
- Find the paperwork for mains workThe inspection mains work needs.
- Find the paperwork for a hazardous areaThe category and inspection for a hazardous area job.
- Find the paperwork for a medical fit-outThe category and inspection for a patient area.
- Find the paperwork for a generator connectionThe category for mains-parallel generation.
المدخلات
مثال محلول بالمدخلات الافتراضية.
- الولاية القضائية
- نيوزيلندا
- العمل
- تركيب جديد أو دائرة فرعية جديدة
- من ينفّذ العمل
- فني كهرباء مرخّص
- تركيب منزلي
- نعم
- الأطوار
- طور واحد
- أقصى طلب لكل طور
- 60 A
- أعمال الشبكة
- لا
- نظام الطاقة الكهروضوئية
- لا
- توليد متوازٍ مع الشبكة
- لا
- تركيب جهد عالٍ
- لا
- منطقة خطرة
- لا
- الأجهزة الطبية الكهربائية
- لا
- لا يتوافق مع الجزء 2 من AS/NZS 3000
- لا
فئة العمل
General prescribed electrical work
- شهادة المطابقة المُدرجة
- نعم
- سجل الفحص المدرج
- لا
- شهادة السلامة الكهربائية، حيثما تُصدر
- 20 يوم عمل بعد التوصيل
- أسماء reg 59 القياسية لهذا التركيب
- الجزء 2 من AS/NZS 3000
- حد طلب reg 57، لكل طور
- 80A
- الطلب مقابل عتبة اللائحة 57
- The demand entered, 60 A per phase, is at or below the reg 57(2) threshold of 80 A per phase.
هذه النتيجة أداة للتصميم. تحقق منها وفق المعيار الحالي.
خطوات الحساب
- فئة العملgeneral
Electricity (Safety) Regulations 2010 reg 6A
- شهادة المطابقة المُدرجةنعم
Electricity (Safety) Regulations 2010 reg 65
- سجل الفحص المدرجلا
Electricity (Safety) Regulations 2010 reg 70
- شهادة السلامة الكهربائية، حيثما تُصدر، بأيام العمل بعد التوصيل20
Electricity (Safety) Regulations 2010 reg 74C
- نسخة من شهادة المطابقة، بعد عدد أيام من العمل20
Electricity (Safety) Regulations 2010 reg 74E
- مدة الاحتفاظ بشهادة المطابقة، بالسنوات7
Electricity (Safety) Regulations 2010 reg 74E
- أسماء reg 59 القياسية لهذا التركيبالجزء 2 من AS/NZS 3000
Electricity (Safety) Regulations 2010 reg 59
- حد طلب المالك لكل طور80A
Electricity (Safety) Regulations 2010 reg 57
- الطلب المُدخل مقابل حد reg 57The demand entered, 60 A per phase, is at or below the reg 57(2) threshold of 80 A per phase.
Electricity (Safety) Regulations 2010 reg 57
حول هذه الحاسبة
How this is calculated
The tool points to the New Zealand regulation that applies to a job. It reads the Electricity (Safety) Regulations 2010. It does not read a Standard.
- Work category. The tool reads the work type and who does it. It names the category of work, such as general prescribed electrical work (reg 6A).
- Certificate of compliance. It says whether the work needs a certificate of compliance (reg 65).
- Record of inspection. It says whether the work needs a record of inspection (reg 70).
- Timing. It gives the days to issue an electrical safety certificate after connection (reg 74C). It gives the days to send a copy of the certificate of compliance. It also gives how long to keep it (reg 74E).
- Standard. It names the Standard that reg 59 sets for this installation.
- Homeowner threshold. For a homeowner, it compares your demand per phase with the reg 57 threshold.
| Step | Table or clause | What it decides |
|---|---|---|
| Category | Reg 6A | The class of the work |
| Certificate of compliance | Reg 65 | Whether one is listed |
| Record of inspection | Reg 70 | Whether one is listed |
| Safety certificate and copy | Regs 74C and 74E | The days and the retention |
| Standard | Reg 59 | The Standard for the installation |
| Homeowner demand | Reg 57 | The threshold per phase |
Australia
Choose a state or territory. The tool does not sort the work into a class. It gives the paperwork rule from the regulator's own page: the certificate, who signs it, where it goes, the deadline, who gets a copy and how long to keep it. It also links the licence register.
Each line names the regulator page and the date AmpSize read it. A line not yet read on that page says "Confirm with your regulator". AmpSize reads these pages again every quarter.
Worked example
- New installation by a licensed person, single phase, 60 A. The tool names general prescribed electrical work. A certificate of compliance is listed and a record of inspection is not. The demand is below the 80 A per phase threshold.
- Paperwork in Victoria. The tool names the Certificate of Electrical Safety, ESVConnect and the 16 day period for prescribed work.
Limits
- The tool points at the regulation. It is not a ruling and it is not advice. Read the current reprint.
- Regs 74A and 74B say which work a safety certificate covers. The tool names the timing only.
- Reg 74E(2A) covers a small stand-alone dwelling that has no consent. It states no period for the copy.
- The work classes are New Zealand law. For Australia the tool gives the paperwork rows only.
See also: Electricity Safety Regulations reg 57 and 59, Who may do electrical work in NZ and Test and tag.
الأسئلة
النتيجة أداة للتصميم. تحقق منها وفق المعيار الحالي.
هل هذه الأداة نصيحة قانونية؟
لا. الأداة مؤشر وليست حكمًا. تسمّي اللائحة التي تدرج العمل، وتعرض الأرقام التي تتضمنها تلك اللائحة. ولا تخبرك بما يحق لك فعله. اقرأ النسخة الحالية المعاد طباعتها من اللوائح، واسأل WorkSafe أو مفتشًا مرخّصًا.
ماذا تعرض الأداة؟
فئة العمل بموجب regulation 6A، وما إذا كانت regulation 65 تذكر شهادة المطابقة، وما إذا كانت regulation 70 تذكر سجل الفحص، ومدة 20 يوم عمل في regulation 74C، وحدود الطلب في regulation 57 و59.
أي إصدار من اللوائح تستخدمه الأداة؟
الإصدار بتاريخ 15 يناير 2026. الأرقام التي تعرضها الأداة هي نفسها في طبعة إعادة الطباعة بتاريخ 4 أبريل 2016. تحقّق من وجود إصدار لاحق على موقع التشريعات في نيوزيلندا قبل الاعتماد على أي نتيجة.
هل تغطي أستراليا؟
نعم، للمستندات. اختر ولاية أو إقليمًا. تعطي الأداة الشهادة وأين تُرسل، والمهلة، والنسخ، ومدة الاحتفاظ، وسجل الترخيص. يذكر كل سطر صفحة الجهة المنظِّمة والتاريخ الذي قرأتها فيه AmpSize. والسطر الذي لم تُقرأ بعد يقول «تحقّق مع جهتك المنظِّمة».
الخلفية
البنود والجداول التي تقرأها هذه الأداة
- Electricity (Safety) Regulations 2010 reg 6ALow-risk, high-risk and general prescribed electrical work
- Electricity (Safety) Regulations 2010 reg 57Exemption for domestic electrical wiring work
- Electricity (Safety) Regulations 2010 reg 70Record of inspection
- reg 57, 59, 65, 74C, 74EThresholds and periods for prescribed electrical work
كل البنود والجداول، مع طريقة التحقق من كل منها
آخر فحص للجداول في 26 Sept 2026.
أدوات ذات صلة
- جدول الاختبار للوحة التوزيعPrint a board test sheet with the limit for each test.AS/NZS 3017AS/NZS 3000Electricity (Safety) Regulations 2010
- حاسبة مقاس الكابلFind the smallest cable size that passes each check.AS/NZS 3008.1.2AS/NZS 3008.1.1AS/NZS 3000
- حاسبة الطلب الأقصىEstimate maximum demand for domestic or non‑domestic loads.AS/NZS 3000 Table C1/C2
هل كان هذا مفيداً؟
سؤال، أو قيمة تبدو خاطئة؟ اتصل بنا.