I-estimate ang maximum demand para sa domestic o non‑domestic loads.

Reads AS/NZS 3000:2018 and Electricity (Safety) Regulations 2010. Tables checked 19 Sept 2026.

Mga input

Worked example gamit ang mga default na input.

Demand table
Table C1 · domestic
Installation
Single domestic o isang living unit
Mga phase
Single phase
Phase voltage
230 V
Mga grupo ng load
4 row

Maximum demand

50.43A

Kada phase
50.43A
A(i) · Lighting
5A
B(i) · Socket-outlets and permanently connected equipment up to 10 A
15A
C · Ranges, cooking appliances and laundry equipment
17.39A
F · Storage water heaters
13.04A

Design aid lang ang resultang ito. I-verify ito laban sa kasalukuyang standard.

Mga hakbang ng kalkulasyon

  1. Talaan ng demandC1 · single domestic

    AS/NZS 3000:2018 Table C1

  2. A(i) · Lighting5A

    AS/NZS 3000:2018 Table C1

  3. B(i) · Socket‑outlets and permanently connected equipment up to 10 A15A

    AS/NZS 3000:2018 Table C1

  4. C · Ranges, cooking appliances and laundry equipment17.39A

    AS/NZS 3000:2018 Table C1

  5. F · Storage water heaters13.04A

    AS/NZS 3000:2018 Table C1

  6. Maximum demand50.43A

    AS/NZS 3000:2018 Table C1

  7. Maximum demand kada phaseResulta50.43A

    AS/NZS 3000:2018 Table C1

Tungkol sa calculator na ito

How this is calculated

The tool works out the maximum demand of an installation from its loads. It follows the load group method of AS/NZS 3000 Appendix C.

  1. Table. Table C1 covers domestic installations: one house or living unit, or a block of living units. Table C2 covers other installations. For Table C2 you pick the occupancy.
  2. Load groups. You enter each load in its group, such as lighting points, socket‑outlet points or kW of cooking. The tool lists only the groups the table assesses for your choice.
  3. Group demand. Each group has its own rule for its load. The tool applies that rule and gives the group demand in amperes. It converts each kW load at the phase voltage you enter.
  4. Living units per phase. A block of living units can take more than one phase. The tool then divides the units by the number of phases and rounds up. It reads the column for that number of units per phase.
  5. Total. The maximum demand is the sum of the group demands.
  6. Per phase. On three phases, the tool divides the total by three. That assumes you spread the load evenly over the phases. Where you cannot, allocate the loads per phase and check the heaviest phase.
StepTable or clauseWhat it decides
Domestic loadsAS/NZS 3000 Table C1The rule for each load group in a house or a block of living units
Other loadsAS/NZS 3000 Table C2The rule for each load group, by occupancy
Living units per phaseTable C1 Note 2The column a block of living units reads on more than one phase
Total and per phaseTable C1 or Table C2The sum of the groups and the share on each phase

Phase voltage

Enter the phase voltage, line to neutral, such as 230 V. The tool converts every kW load at that voltage. The 400 V between lines would read every kW group 42 % low. On a three‑phase supply the tool refuses a line voltage and asks for the phase voltage.

Common installations, worked with the tool

Each line states its loads. Every line uses a phase voltage of 230 V.

  • House on one phase. It uses Table C1 for one house. The loads are 30 lighting points, 25 socket‑outlet points, 8 kW of cooking and a 3 kW storage water heater. The maximum demand is 50.43 A.
  • The same house on three phases. The maximum demand is 16.81 A per phase and 50.43 A over all phases.
  • Block of 12 living units on three phases. Table C1 for blocks of living units, with the same load rows. The tool reads 4 units per phase. The maximum demand is 75 A per phase and 225 A over all phases.
  • Office on three phases. It uses Table C2 for factories, shops and offices. The loads are 10 kW of lighting, 20 socket‑outlets and motors of 15 A, 10 A and 5 A. The maximum demand is 44.93 A per phase and 134.78 A over all phases.

New Zealand and Australia

AS/NZS 3000 Appendix C applies in both countries, so the tool has no country select.

Keep the result

Every input sits in the page address, so the link in your browser reproduces the calculation. The PDF button prints the result with its steps and table references. Saving a calculation to a project needs a free account.

See also: Commercial maximum demand with Table C2, Domestic maximum demand with Table C1 and Maximum demand and diversity.

Mga tanong

Design aid ang resulta. I-verify ito laban sa kasalukuyang standard.

Ano ang ginagawa ng maximum demand calculator?

Ina-apply ng tool ang demand rule para sa bawat load group na idadagdag mo. Inililista nito ang demand sa amperes para sa bawat group, pagkatapos iniuulat ang total demand at ang demand kada phase. Ipinapakita ng bawat linya ang table at ang column na pinanggalingan nito.

Aling AS/NZS 3000 table ang ginagamit ng maximum demand calculator?

Gumagamit ito ng AS/NZS 3000:2018 Table C1 para sa isang domestic installation o block ng living units. Gumagamit ito ng Table C2 para sa ibang installation, na may residential o commercial column. Piliin muna ang table at mode, dahil binabago nila kung aling rule ang sinusunod ng bawat load group.

Ano ang nagtatakda ng demand rule para sa bawat load group?

Itinatakda ng table at ng mode ang rule para sa bawat group. Kino-convert ng supply voltage ang mga group na nasa kilowatts tungo sa amperes. Hinahati ng bilang ng phase ang kabuuan. Sa living units mode, ang bilang ng unit sa bawat phase ang nagdidikta ng resulta. Ilagay ang kabuuang bilang ng unit at ang bilang ng phase.

Paano binibilang ang living units sa tatlong phase?

Hinahati ng tool ang bilang ng unit sa tatlo, gaya ng hinihingi ng Table C1 Note b. May mga group na tumatanggap ng listahan ng indibidwal na item, hindi ng iisang quantity. May mga group na ayon sa assessment at walang dinadagdag. May lumalabas na note sa itaas ng regulation 59 threshold.

Maaari ko bang i-share o i-save ang demand na kalkulasyon?

Oo. Nasa page address ang table, mode, voltage, phases at bawat load row. Kopyahin ang link para maipadala ang parehong demand assessment sa iba. Kailangan ng account para i-save ito sa ilalim ng project name. Ang kondisyon ng New Zealand ang default.

Mga worked example

Lahat ng 8 na guide para sa calculator na ito

Background

Mga clause at table na binabasa ng tool na ito

Bawat clause at table, kasama kung paano ito na-verify

Huling na-check ang mga table noong 19 Sept 2026.

Nakatulong ba ito?