Lumaktaw sa nilalaman
AmpSize

Generator sizing mula sa load list

I-size ang generator mula sa load list kasama ang motor starting.

Walang standard

Mga input

Worked example gamit ang mga default na input.

Mga phase
Three phase
Voltage
400 V
Mga load, kasama ang step kung saan nagsisimula ang bawat isa
2 row
Pinakamalaking voltage dip na pinapayagan
15 %
Subtransient reactance
15 %
Rated power factor
0.8
Derating para sa altitude at init
0 %

Rating ng generator, hindi bababa sa

50kVA

Running load
19.05kVA
Laki na itinakda ng
Starting step 2
Pinakamalaking dip sa laking ito
15%
Full load current sa laking ito
72.17A
Fault current sa laking ito
481.13A

Design aid lang ang resultang ito. I-verify ito laban sa kasalukuyang standard.

Mga hakbang ng kalkulasyon

  1. Load 1: 10 kW, step 110kVA
  2. Load 2: 7.5 kW na motor, direct on line, step 29.8 kVA habang tumatakbo, 58.82 kVA sa pag-start
  3. Running real power18.33kW
  4. Running reactive power5.16kvar
  5. Running load19.05kVA
  6. Itakda ang kVA para sa running load, hindi bababa sa22.92kVA
  7. Step 1: itakda ang kVA para sa 15 % na dip8.5kVA
  8. Step 2: itakda ang kVA para sa 15 % na dipResulta50kVA
  9. Sukat na itinakda ngStarting step 2
  10. Pinakamalaking dip sa laking ito15%
  11. Full load current sa laking ito72.17A
  12. Fault current sa laking ito481.13A

Tungkol sa calculator na ito

How this is calculated

A generator has to do two things. It has to carry the running load, and it has to hold its voltage when a large load starts. A small set can run a pump but still dip so far as the pump starts that lights flicker and contactors drop out. This tool works both and gives the larger as the size.

You list the loads with the power each draws, its power factor and the step it starts in. Loads in the same step start together. For the running load the tool adds the real power and the reactive power of every load, then takes the kVA from both. Loads at different power factors do not add as kVA. The set must also give the real power at its own rated power factor, which is often 0.8.

A motor draws more than its running current as it starts. The tool takes the motor's running kVA from the motor tool's full load current, then multiplies it by the start: six for direct on line, a third of that for star-delta, the multiple you enter for a soft starter, and one for a variable speed drive. For each step the tool finds the smallest set whose reactance keeps the dip within the limit you set. The largest need, running or starting, divided by what is left after any reduction for altitude and heat, is the size. The generator tool then gives the full load current and fault current of a set at that rating.

AmpSize holds no generator standard. The dip limit, the reactance and the soft starter multiple are inputs, and the result says so.

StepTable or clauseWhat it decides
Running loadP and Q added, kVA from bothThe set kVA for the running load
Rated power factorSet kW = kVA × rated pfThe set kVA for the running kW
Motor starting kVAThe motor tool's full load current × the start multipleThe kVA each step draws as it starts
Voltage dipDip = x × step kVA ÷ (set kVA + x × step kVA)The set kVA for each step
Altitude and heatSize ÷ (1 − the reduction)The rating to buy
Current and fault levelThe generator toolThe full load current and fault current at that rating

Worked examples

Limits

The dip is worked from the set's subtransient reactance alone. It leaves out the voltage regulator's recovery, the engine's speed dip, and loads already running, which a maker's sizing program models. Use the size as a first pick, then check it on the maker's data.

The tool does not cover a set in parallel with the network, a non‑linear load's effect on the alternator, or the installation rules for a generating set.

See also: Generator, Motor and Maximum demand.

Mga tanong

Design aid ang resulta. I-verify ito laban sa kasalukuyang standard.

Paano ko i-size ang generator para sa motor?

Humihila ang motor ng ilang beses ng running current nito habang nagsisimula, at bumababa ang voltage ng set. Kinakalkula ng tool ang starting kVA ng bawat step at ang set size na nagpapanatili sa dip sa loob ng limit na itinakda mo.

Bakit hindi lang basta sum ng kVA ang running load?

Ang mga load na may magkakaibang power factor ay idinadagdag bilang real at reactive power. Idinadagdag ng tool ang kW at kvar, pagkatapos ay kinukuha ang kVA mula sa dalawa. Dapat ding ibigay ng set ang kW sa rated power factor nito, na kadalasan ay 0.8.

Anong voltage dip ang dapat kong payagan?

Depende ito sa mga load. Kumikislap ang ilaw sa mas maliit na dip kaysa kayang lampasan ng motor, at puwedeng mag-drop out ang contactors sa malaking dip. Walang hawak na generator standard ang AmpSize para magtakda ng limit, kaya ikaw ang mag-e-enter nito.

Gaano kaliit puwedeng maging set kapag may soft starter o VSD?

Bumababa ang starting kVA kasabay ng starting current. Ang star-delta ay nagsisimula sa isang katlo ng direct on line. Ang soft starter ay nagsisimula sa multiple na ilalagay mo, at ang variable speed drive ay malapit sa running current nito.

Isinasaalang-alang ba nito ang altitude at init?

I-enter ang derating ng maker bilang percent. Hinahati ng tool ang size sa natitira. Ibinibigay rin nito ang full load current at fault current ng set sa rating na iyon, mula sa generator tool.

Mga worked example

Background

Nakatulong ba ito?

May tanong, o may value na mukhang mali? Makipag-ugnayan sa amin.