حجم المحوّل من الطلب
حدّد مقاس المحوّل من الطلب، مع النمو والخسائر.
جرّب مشروعاً 4
تملأ كل مهمة قيماً توضيحية. استبدلها بقيمك.
- Size a transformer for a new siteThe rating, loading and losses for a site demand with room to grow.
- Size a transformer from a kW demandA demand in kilowatts turned into the transformer rating at its power factor.
- Check a rural single‑phase transformerThe size and voltage drop of a single‑phase transformer for a farm supply.
- Check a plant transformer regulationThe voltage a large transformer drops at a low power factor.
المدخلات
مثال محلول بالمدخلات الافتراضية.
- الطلب الأقصى
- 220
- الطلب الداخل
- kVA
- معامل القدرة
- 0.9
- هامش النمو
- 20 %
- أكبر حمل عند حمل التصميم
- 100 %
- الأطوار
- ثلاثي الأطوار
- الجهد الأولي
- 11,000 V
- الجهد الثانوي
- 400 V
- المعاوقة
- 4.5 %
- نسبة X/R
- 4
- فقد بدون حمل، من التصنيف
- 0.2 %
- فقد الحمل عند الحمل الكامل، من التصنيف
- 1.1 %
حجم المحول
300kVA
- حمل التصميم مع النمو
- 264kVA
- الحمل الحالي
- 73.3%
- الحمل مع النمو
- 88%
- تنظيم الجهد مع النمو
- 2.59%
- الفواقد مع النمو
- 3.16kW
- تيار الحمل الكامل الثانوي
- 433.01A
- تيار العطل الثانوي
- 9,622.5A
هذه النتيجة أداة للتصميم. تحقق منها وفق المعيار الحالي.
خطوات الحساب
- حمل التصميم مع نمو 20 %264kVA
- أصغر مقاس نموذجي عند حمل 100 %300 kVA
- الحمل الحالي73.3%
- الحمل مع النمو88%
- المقاومة، من التصنيف1.09%
- المفاعلة، من التصنيف4.37%
- تنظيم الجهد مع النمو2.59%
- الجهد الثانوي عند حمل التصميم389.7V
- الفواقد مع النمو3.16kW
- الكفاءة مع النمو98.69%
- تيار الحمل الكامل الثانوي433.01A
- تيار العطل الثانوي9,622.5A
حول هذه الحاسبة
How this is calculated
A transformer is sized from the maximum demand it will carry, with room for the load to grow. Too small and it runs hot and drops too much voltage; too large and it costs more and wastes energy in its core every hour of the year. This tool finds the size and shows what it does at the load.
You enter the maximum demand, in kVA or in kW with a power factor, and a growth allowance. The design load is the demand plus that growth. The tool picks the smallest rating from a list of typical sizes that carries the design load within the loading limit you set. The list is common distribution and site ratings, not a standard's list.
At that size it works the loading today and with growth, then the voltage regulation: the drop through the transformer's own resistance and reactance at the design load and power factor. The impedance on the rating plate splits into the two by the X/R ratio. The losses are the core loss, which is there whenever the transformer is energised, plus the winding loss, which rises with the square of the loading. The full load and fault currents at the size come from the transformer tool.
The impedance, X/R ratio and losses are maker's data. The defaults are typical figures, and the result names them as assumptions.
| Step | Table or clause | What it decides |
|---|---|---|
| Design load | Demand plus the growth allowance | The load the size must carry |
| Size | Smallest typical rating within the loading limit | The transformer rating |
| Resistance and reactance | Impedance split by the X/R ratio | The two parts of the drop |
| Voltage regulation | Loading times the drop at the power factor | The voltage lost through the transformer |
| Losses | Core loss plus winding loss times loading squared | The heat and the running cost |
| Currents | The transformer tool | The full load and fault current at the size |
Worked examples
- A 220 kVA site with 20 % growth needs a 300 kVA transformer. It runs at 88 % with growth and loses 2.59 % of its voltage.
- A 180 kW load at 0.85 power factor with 25 % growth also needs 300 kVA, at 88.2 % with growth.
- A 420 kVA factory with 30 % growth, loaded to 80 % at most needs 750 kVA, at 72.8 % with growth.
- A 60 kVA single‑phase rural supply with no growth needs 75 kVA, at 80 %.
- A 900 kVA plant at 0.8 power factor, 6 % impedance and X/R of 7 needs 1,250 kVA. Its regulation is 3.57 % at 82.8 % with growth.
Limits
The regulation is the drop through the transformer alone. The network upstream and the cables downstream add their own drop; the total voltage drop tool adds the cable parts. A tap changer or off-load taps can raise the secondary voltage to make up for it.
The tool does not cover transformers in parallel, harmonic loads, the temperature rise of the windings or the network company's own sizing rules for a supply transformer.
See also: Transformer, Maximum demand and Fault level at a board.
الأسئلة
النتيجة أداة للتصميم. تحقق منها وفق المعيار الحالي.
كيف أحجّم محوّلًا؟
ابدأ من الطلب الأقصى، وأضِف هامشًا للنمو، واختر أصغر قيمة اسمية قياسية تتحمل النتيجة. ثم تحقق من هبوط الجهد في المحوّل عند هذا الحمل، ومن فقده على شكل حرارة.
كم من النمو يجب أن أترك له هامشاً؟
يعتمد ذلك على الموقع. نسبة 20 إلى 30 % شائعة حيث يُرجَّح زيادة الحمل. يدوم المحوّل عقوداً، وتغييره لاحقاً يكلّف أكثر من اختيار مقاس أكبر الآن.
ما تنظيم جهد المحوّل؟
الهبوط في جهد الثانوي من حالة بلا حمل إلى الحمل، كنسبة مئوية. يأتي من مقاومة المحوّل ومفاعلته، ويكون أكبر عند معامل قدرة منخفض.
لماذا لا أختار محوّلًا أكبر بكثير؟
تكلّف الوحدة الأكبر أكثر، ويستمر فقد القلب فيها طوال اليوم وكل يوم، حتى عند الحمل الخفيف. عند تحديد مقاس المحوّل قريباً من الحمل، يعمل حيث تكون خسائره أدنى ما يمكن بالنسبة للطاقة التي يوفّرها.
من أين تأتي المعاوقة والفواقد؟
المعاوقة مدوّنة على لوحة البيانات. الخسائر ونسبة X/R موجودة في تقرير اختبار الصانع. القيم الافتراضية للأداة أرقام نموذجية حتى تتوفر لديك الأرقام الحقيقية.
أدوات ذات صلة
هل كان هذا مفيداً؟
سؤال، أو قيمة تبدو خاطئة؟ اتصل بنا.