جدول الأحمال عبر اللوحات
الطلب الأقصى للوحات الموقع وفق معامل التنوع للوحات التوزيع.
Reads AS/NZS 3000:2018. Tables checked 26 Sept 2026.
جرّب مشروعاً 4
تملأ كل مهمة قيماً توضيحية. استبدلها بقيمك.
- Schedule a workshop site with four boardsThe demand of a main board, two boards and a mezzanine board by Table C4.
- Demand of a house with a garage boardThe single‑phase demand of a house board feeding a garage board.
- Check a submain device against its boardWhether a 160 A submain device covers a busy board of 14 circuits.
- Site demand for a supply applicationThe site demand in kVA of a shop with a main board and two boards.
المدخلات
مثال محلول بالمدخلات الافتراضية.
- الأطوار
- ثلاثي الأطوار
- الجهد
- 400 V
- اللوحات، اللوحة الرئيسية أولًا
- 3 صفوف
- اللوحات مطابقة للمعيار AS/NZS 61439 أو AS/NZS 3439
- نعم
الحمل لكل طور
325.5A
- أقصى حمل للموقع
- 225.5kVA
- مجموع التصنيفات عند اللوحة الرئيسية
- 465A
- اللوحات
- 3
هذه النتيجة أداة للتصميم. تحقق منها وفق المعيار الحالي.
خطوات الحساب
- MSB: 8 جهاز، مجموع التصنيفات 465 A×0.70
AS/NZS 3000:2018 Table C4
- MSB: الطلب325.5A
AS/NZS 3000:2018 App C Para C2.4.4
- DB1: 12 جهاز، مجموع التصنيفات 260 A×0.60
AS/NZS 3000:2018 Table C4
- DB1: الطلب156A
AS/NZS 3000:2018 App C Para C2.4.4
- DB2: 8 جهاز، مجموع التصنيفات 150 A×0.70
AS/NZS 3000:2018 Table C4
- DB2: الطلب105A
AS/NZS 3000:2018 App C Para C2.4.4
- الحمل لكل طورالنتيجة325.5A
AS/NZS 3000:2018 App C Para C2.4.4
- أقصى حمل للموقع225.5kVA
حول هذه الحاسبة
How this is calculated
A load schedule lists the boards of a site and what each one draws. The tool works the maximum demand of each board by the switchboard diversity method of AS/NZS 3000 Appendix C, and carries it up the tree to the main board.
Para C2.4.4 sets the method for switchboards that conform to the AS/NZS 3439 or AS/NZS 61439 series. The maximum demand of a board is the sum of the overload ratings of its circuits, times a factor from Table C4. The factor falls as the number of circuit protective devices downstream rises.
On each board the tool counts its final subcircuit devices and one device for each submain it feeds. It adds the ratings of the final subcircuits and the rating of each submain device. The submain is a circuit of the board that feeds it, so a sub‑board's demand is never added twice. Table C4 prints no factor below two devices, and the tool then takes the sum as the demand.
The ratings are per phase. On a three‑phase board, enter the sum on the most loaded phase, and count a three‑pole device once. The tool gives each board's demand in amps and in kVA, and the site's demand at the main board.
Each sub‑board's demand is checked against the device that feeds it. A board whose demand is more than its submain device gets a warning.
The schedule prints as a sheet with one row a board.
| Step | Table or clause | What it decides |
|---|---|---|
| Devices on a board | Final subcircuits plus one a submain | The count Table C4 is read at |
| Sum of ratings | Para C2.4.4 | The circuits' ratings plus each submain device's rating |
| Diversity factor | Table C4 | The factor for the number of devices |
| Board demand | Para C2.4.4 | The sum times the factor |
| Submain check | The demand against the feeding device | Whether a submain device is smaller than its board's demand |
Worked examples
- A workshop site with four boards has a site maximum demand of 283.5 A a phase, 196.4 kVA. The main board's ratings add to 405 A.
- A house with a garage board has a maximum demand of 149.1 A, 34.3 kVA. The main board's ratings add to 213 A.
- A main board feeding one busy board has a site maximum demand of 200 A a phase, 138.6 kVA. The main board's ratings add to 250 A. The busy board's demand of 192 A is more than its 160 A submain device.
- A main board and two distribution boards has a site maximum demand of 325.5 A a phase, 225.5 kVA. The main board's ratings add to 465 A.
Limits
The method is only for boards that conform to the AS/NZS 3439 or AS/NZS 61439 series. For other boards, use another Appendix C method, such as the maximum demand tool. With the toggle off, the tool takes no Table C4 factor and gives the sum of the ratings.
It works from device ratings, not from the loads. A board full of large devices with small loads gives a high demand. A load-by-load assessment can give a lower figure.
See also: Maximum demand, Circuit loading and Max demand by phase.
الأسئلة
النتيجة أداة للتصميم. تحقق منها وفق المعيار الحالي.
كيف تحسب الطلب الأقصى للوحة التوزيع؟
وفق AS/NZS 3000 Para C2.4.4، اجمع قيم الحمل الزائد الاسمية لدوائر اللوحة، واضربها في معامل Table C4 لعدد الأجهزة: 0.9 لعدد 2 أو 3، و0.8 لعدد 4 أو 5، و0.7 لعدد 6 إلى 9، و0.6 لعدد 10 أو أكثر.
كيف تُحصى اللوحات الفرعية؟
المغذّي الفرعي دائرة من اللوحة التي تغذّيه. تحسبه الأداة كجهاز واحد على تلك اللوحة، بقيمته الاسمية للجهاز. لذلك لا يُضاف طلب اللوحة الفرعية إلى طلب لوحتها الأم مرة ثانية.
على أي لوحات توزيع تنطبق هذه الطريقة؟
ينطبق Para C2.4.4 على لوحات التوزيع المطابقة لسلسلة AS/NZS 3439 أو AS/NZS 61439. وبالنسبة للوحات الأخرى، استخدم طريقة أخرى من الملحق C، مثل مجموعات الأحمال في Table C1 أو C2.
ماذا لو كان طلب اللوحة أكبر من جهاز المغذّي الفرعي؟
تحذّر الأداة. يصبح الجهاز الذي يغذّي اللوحة عندها أصغر من الطلب الذي تعطيه الطريقة. تحقّق من الجهاز والكابل والأحمال على اللوحة.
كيف أدخل لوحة ثلاثية الأطوار؟
أدخل مجموع القيم الاسمية على الطور الأكثر حملًا، واحسب الجهاز ثلاثي الأقطاب مرة واحدة. تعطي الأداة الطلب لكل طور وبوحدة kVA عند الجهد الذي تحدده.
البنود والجداول التي تقرأها هذه الأداة
- AS/NZS 3000:2018 App C Para C2.4.4Maximum demand by switchboard diversity
- AS/NZS 3000:2018 Table C4Upstream circuit loading after diversity
كل البنود والجداول، مع طريقة التحقق من كل منها
آخر فحص للجداول في 26 Sept 2026.
أدوات ذات صلة
هل كان هذا مفيداً؟
سؤال، أو قيمة تبدو خاطئة؟ اتصل بنا.