Reads Electricity (Safety) Regulations 2010. Tables checked 26 Sept 2026.
कोई प्रोजेक्ट आज़माएँ 12
हर जॉब में उदाहरण मान भरे होते हैं। उन्हें अपने मानों से बदलें।
- Find the paperwork for a home solar jobThe work category and the certificates a home PV alteration needs in NZ.
- Find the paperwork for a job in NSWThe CCEW, the eCert portal and the 7 day deadline.
- Find the paperwork for a job in VictoriaThe certificate of electrical safety, where it goes and when.
- Find the paperwork for a job in QueenslandThe certificate of testing and compliance and how long to keep it.
- Find the notices for a job in WAThe preliminary notice, the completion notice and the safety certificate.
- Find the paperwork for a new houseThe certificates a new domestic installation needs.
- Find the paperwork for a like-for-like repairThe category of a replacement in an existing installation.
- Find what a homeowner may doThe limits on a homeowner's own wiring work.
- Find the paperwork for mains workThe inspection mains work needs.
- Find the paperwork for a hazardous areaThe category and inspection for a hazardous area job.
- Find the paperwork for a medical fit-outThe category and inspection for a patient area.
- Find the paperwork for a generator connectionThe category for mains-parallel generation.
इनपुट
डिफ़ॉल्ट इनपुट के साथ एक कार्य-उदाहरण।
- क्षेत्राधिकार
- न्यूज़ीलैंड
- काम
- नई इंस्टॉलेशन या नया सबसर्किट
- काम कौन करता है
- लाइसेंसशुदा विद्युत कर्मी
- घरेलू इंस्टॉलेशन
- हाँ
- फ़ेज़
- सिंगल-फ़ेज़
- प्रति फ़ेज़ अधिकतम माँग
- 60 A
- मेन का काम
- नहीं
- फ़ोटोवोल्टेइक सिस्टम
- नहीं
- मेन के समानांतर जनरेशन
- नहीं
- उच्च वोल्टेज इंस्टॉलेशन
- नहीं
- खतरनाक क्षेत्र
- नहीं
- विद्युत चिकित्सा उपकरण
- नहीं
- AS/NZS 3000 के भाग 2 का पालन नहीं करता
- नहीं
कार्य श्रेणी
General prescribed electrical work
- अनुपालन प्रमाणपत्र सूचीबद्ध
- हाँ
- सूचीबद्ध निरीक्षण रिकॉर्ड
- नहीं
- विद्युत सुरक्षा प्रमाणपत्र, जहाँ जारी किया जाता है
- कनेक्शन के बाद 20 कार्य दिवस
- इस इंस्टॉलेशन के लिए मानक reg 59 नाम
- AS/NZS 3000 का Part 2
- reg 57 मांग सीमा, प्रति फ़ेज़
- 80A
- reg 57 की सीमा के मुकाबले मांग
- The demand entered, 60 A per phase, is at or below the reg 57(2) threshold of 80 A per phase.
यह परिणाम डिज़ाइन में सहायता के लिए है। इसे मौजूदा मानक से सत्यापित करें।
गणना के चरण
- कार्य श्रेणीgeneral
Electricity (Safety) Regulations 2010 reg 6A
- अनुपालन प्रमाणपत्र सूचीबद्धहाँ
Electricity (Safety) Regulations 2010 reg 65
- सूचीबद्ध निरीक्षण का रिकॉर्डनहीं
Electricity (Safety) Regulations 2010 reg 70
- विद्युत सुरक्षा प्रमाणपत्र, जहाँ जारी हो, कनेक्शन के बाद कार्य दिवसों में20
Electricity (Safety) Regulations 2010 reg 74C
- अनुपालन प्रमाणपत्र की प्रति, काम के बाद कितने दिनों में20
Electricity (Safety) Regulations 2010 reg 74E
- अनुपालन प्रमाणपत्र अवधारण, वर्ष7
Electricity (Safety) Regulations 2010 reg 74E
- इस इंस्टॉलेशन के लिए मानक reg 59 नामAS/NZS 3000 का भाग 2
Electricity (Safety) Regulations 2010 reg 59
- होमओनर माँग सीमा, प्रति फ़ेज़80A
Electricity (Safety) Regulations 2010 reg 57
- reg 57 सीमा के मुकाबले दर्ज की गई माँगThe demand entered, 60 A per phase, is at or below the reg 57(2) threshold of 80 A per phase.
Electricity (Safety) Regulations 2010 reg 57
इस कैलकुलेटर के बारे में
How this is calculated
The tool points to the New Zealand regulation that applies to a job. It reads the Electricity (Safety) Regulations 2010. It does not read a Standard.
- Work category. The tool reads the work type and who does it. It names the category of work, such as general prescribed electrical work (reg 6A).
- Certificate of compliance. It says whether the work needs a certificate of compliance (reg 65).
- Record of inspection. It says whether the work needs a record of inspection (reg 70).
- Timing. It gives the days to issue an electrical safety certificate after connection (reg 74C). It gives the days to send a copy of the certificate of compliance. It also gives how long to keep it (reg 74E).
- Standard. It names the Standard that reg 59 sets for this installation.
- Homeowner threshold. For a homeowner, it compares your demand per phase with the reg 57 threshold.
| Step | Table or clause | What it decides |
|---|---|---|
| Category | Reg 6A | The class of the work |
| Certificate of compliance | Reg 65 | Whether one is listed |
| Record of inspection | Reg 70 | Whether one is listed |
| Safety certificate and copy | Regs 74C and 74E | The days and the retention |
| Standard | Reg 59 | The Standard for the installation |
| Homeowner demand | Reg 57 | The threshold per phase |
Australia
Choose a state or territory. The tool does not sort the work into a class. It gives the paperwork rule from the regulator's own page: the certificate, who signs it, where it goes, the deadline, who gets a copy and how long to keep it. It also links the licence register.
Each line names the regulator page and the date AmpSize read it. A line not yet read on that page says "Confirm with your regulator". AmpSize reads these pages again every quarter.
Worked example
- New installation by a licensed person, single phase, 60 A. The tool names general prescribed electrical work. A certificate of compliance is listed and a record of inspection is not. The demand is below the 80 A per phase threshold.
- Paperwork in Victoria. The tool names the Certificate of Electrical Safety, ESVConnect and the 16 day period for prescribed work.
Limits
- The tool points at the regulation. It is not a ruling and it is not advice. Read the current reprint.
- Regs 74A and 74B say which work a safety certificate covers. The tool names the timing only.
- Reg 74E(2A) covers a small stand-alone dwelling that has no consent. It states no period for the copy.
- The work classes are New Zealand law. For Australia the tool gives the paperwork rows only.
See also: Electricity Safety Regulations reg 57 and 59, Who may do electrical work in NZ and Test and tag.
सवाल
परिणाम एक डिज़ाइन सहायता है। मौजूदा मानक से सत्यापित करें।
क्या यह टूल कानूनी सलाह है?
नहीं। यह टूल एक संकेत है, फ़ैसला नहीं। यह वह नियमन नामित करता है जो काम सूचीबद्ध करता है, और उस नियमन में दिए आँकड़े दिखाता है। यह नहीं बताता कि आप क्या कर सकते हैं। नियमों का मौजूदा रीप्रिंट पढ़ें और WorkSafe या लाइसेंसधारी इंस्पेक्टर से पूछें।
टूल क्या रिपोर्ट करता है?
regulation 6A के अंतर्गत कार्य श्रेणी, regulation 65 सर्टिफ़िकेट ऑफ़ कंप्लायंस सूचीबद्ध करता है या नहीं, regulation 70 निरीक्षण रिकॉर्ड सूचीबद्ध करता है या नहीं, regulation 74C की 20 कार्य दिवस की अवधि, और regulations 57 और 59 की मांग सीमाएँ।
यह नियमों का कौन सा संस्करण इस्तेमाल करता है?
यह 15 जनवरी 2026 का संस्करण है। टूल जो आंकड़े रिपोर्ट करता है वे 4 अप्रैल 2016 के रीप्रिंट में भी वही हैं। किसी परिणाम पर भरोसा करने से पहले न्यूज़ीलैंड legislation वेबसाइट पर बाद का संस्करण जाँचें।
क्या यह ऑस्ट्रेलिया को कवर करता है?
हाँ, पेपरवर्क के लिए। कोई राज्य या टेरिटरी चुनें। टूल सर्टिफ़िकेट, वह कहाँ जाता है, डेडलाइन, कॉपियाँ, रिटेंशन और लाइसेंस रजिस्टर देता है। हर पंक्ति रेगुलेटर पेज और उस तारीख का नाम देती है जब AmpSize ने उसे पढ़ा। जो पंक्ति अभी तक नहीं पढ़ी गई, वह कहती है: अपने रेगुलेटर से पुष्टि करें।
बैकग्राउंड
वे Clauses और Tables जो यह टूल पढ़ता है
- Electricity (Safety) Regulations 2010 reg 6ALow-risk, high-risk and general prescribed electrical work
- Electricity (Safety) Regulations 2010 reg 57Exemption for domestic electrical wiring work
- Electricity (Safety) Regulations 2010 reg 70Record of inspection
- reg 57, 59, 65, 74C, 74EThresholds and periods for prescribed electrical work
हर Clause और Table, और उनकी सत्यापन की विधि
Tables आख़िरी बार 26 Sept 2026 को जाँची गईं।
संबंधित टूल
- स्विचबोर्ड के लिए टेस्ट शेड्यूलPrint a board test sheet with the limit for each test.AS/NZS 3017AS/NZS 3000Electricity (Safety) Regulations 2010
- केबल आकार कैलकुलेटरFind the smallest cable size that passes each check.AS/NZS 3008.1.2AS/NZS 3008.1.1AS/NZS 3000
- अधिकतम मांग कैलकुलेटरEstimate maximum demand for domestic or non‑domestic loads.AS/NZS 3000 Table C1/C2
क्या यह उपयोगी था?
कोई सवाल, या कोई मान गलत लगता है? हमसे संपर्क करें।