Lộ trình chứng nhận điện
Tìm giấy tờ cho công việc ở NZ hoặc Úc.
Reads Electricity (Safety) Regulations 2010. Tables checked 26 Sept 2026.
Thử một công việc 12
Mỗi công việc điền sẵn giá trị ví dụ. Hãy thay bằng giá trị của bạn.
- Find the paperwork for a home solar jobThe work category and the certificates a home PV alteration needs in NZ.
- Find the paperwork for a job in NSWThe CCEW, the eCert portal and the 7 day deadline.
- Find the paperwork for a job in VictoriaThe certificate of electrical safety, where it goes and when.
- Find the paperwork for a job in QueenslandThe certificate of testing and compliance and how long to keep it.
- Find the notices for a job in WAThe preliminary notice, the completion notice and the safety certificate.
- Find the paperwork for a new houseThe certificates a new domestic installation needs.
- Find the paperwork for a like-for-like repairThe category of a replacement in an existing installation.
- Find what a homeowner may doThe limits on a homeowner's own wiring work.
- Find the paperwork for mains workThe inspection mains work needs.
- Find the paperwork for a hazardous areaThe category and inspection for a hazardous area job.
- Find the paperwork for a medical fit-outThe category and inspection for a patient area.
- Find the paperwork for a generator connectionThe category for mains-parallel generation.
Dữ liệu nhập
Ví dụ tính toán với dữ liệu nhập mặc định.
- Khu vực pháp lý
- New Zealand
- Công việc
- Lắp đặt mới hoặc nhánh phụ mới
- Ai thực hiện công việc
- Thợ điện có giấy phép
- Lắp đặt dân dụng
- Có
- Các pha
- Một pha
- Nhu cầu tối đa trên mỗi pha
- 60 A
- Công việc trên lưới
- Không
- Hệ thống quang điện
- Không
- Phát điện song song với lưới
- Không
- Lắp đặt cao áp
- Không
- Khu vực nguy hiểm
- Không
- Thiết bị y tế điện
- Không
- Không tuân thủ Phần 2 của AS/NZS 3000
- Không
Loại công việc
General prescribed electrical work
- Chứng nhận tuân thủ đã liệt kê
- Có
- Biên bản kiểm tra được liệt kê
- Không
- Chứng nhận an toàn điện, nếu có cấp
- 20 ngày làm việc sau khi đấu nối
- Tên theo Standard reg 59 cho lắp đặt này
- Part 2 của AS/NZS 3000
- Ngưỡng nhu cầu reg 57, mỗi pha
- 80A
- Nhu cầu so với ngưỡng quy định 57
- The demand entered, 60 A per phase, is at or below the reg 57(2) threshold of 80 A per phase.
Kết quả này là công cụ hỗ trợ thiết kế. Hãy kiểm tra theo tiêu chuẩn hiện hành.
Các bước tính toán
- Loại công việcgeneral
Electricity (Safety) Regulations 2010 reg 6A
- Chứng nhận tuân thủ đã liệt kêCó
Electricity (Safety) Regulations 2010 reg 65
- Hồ sơ kiểm tra đã liệt kêKhông
Electricity (Safety) Regulations 2010 reg 70
- Chứng nhận an toàn điện, nếu có cấp, số ngày làm việc sau khi đấu nối20
Electricity (Safety) Regulations 2010 reg 74C
- Bản sao chứng nhận hợp quy, số ngày sau khi hoàn thành công việc20
Electricity (Safety) Regulations 2010 reg 74E
- Thời gian lưu giữ chứng nhận tuân thủ, năm7
Electricity (Safety) Regulations 2010 reg 74E
- Tên theo Standard reg 59 cho lắp đặt nàyPhần 2 của AS/NZS 3000
Electricity (Safety) Regulations 2010 reg 59
- Ngưỡng nhu cầu của hộ gia đình, mỗi pha80A
Electricity (Safety) Regulations 2010 reg 57
- Nhu cầu đã nhập so với ngưỡng quy định 57The demand entered, 60 A per phase, is at or below the reg 57(2) threshold of 80 A per phase.
Electricity (Safety) Regulations 2010 reg 57
Giới thiệu công cụ tính này
How this is calculated
The tool points to the New Zealand regulation that applies to a job. It reads the Electricity (Safety) Regulations 2010. It does not read a Standard.
- Work category. The tool reads the work type and who does it. It names the category of work, such as general prescribed electrical work (reg 6A).
- Certificate of compliance. It says whether the work needs a certificate of compliance (reg 65).
- Record of inspection. It says whether the work needs a record of inspection (reg 70).
- Timing. It gives the days to issue an electrical safety certificate after connection (reg 74C). It gives the days to send a copy of the certificate of compliance. It also gives how long to keep it (reg 74E).
- Standard. It names the Standard that reg 59 sets for this installation.
- Homeowner threshold. For a homeowner, it compares your demand per phase with the reg 57 threshold.
| Step | Table or clause | What it decides |
|---|---|---|
| Category | Reg 6A | The class of the work |
| Certificate of compliance | Reg 65 | Whether one is listed |
| Record of inspection | Reg 70 | Whether one is listed |
| Safety certificate and copy | Regs 74C and 74E | The days and the retention |
| Standard | Reg 59 | The Standard for the installation |
| Homeowner demand | Reg 57 | The threshold per phase |
Australia
Choose a state or territory. The tool does not sort the work into a class. It gives the paperwork rule from the regulator's own page: the certificate, who signs it, where it goes, the deadline, who gets a copy and how long to keep it. It also links the licence register.
Each line names the regulator page and the date AmpSize read it. A line not yet read on that page says "Confirm with your regulator". AmpSize reads these pages again every quarter.
Worked example
- New installation by a licensed person, single phase, 60 A. The tool names general prescribed electrical work. A certificate of compliance is listed and a record of inspection is not. The demand is below the 80 A per phase threshold.
- Paperwork in Victoria. The tool names the Certificate of Electrical Safety, ESVConnect and the 16 day period for prescribed work.
Limits
- The tool points at the regulation. It is not a ruling and it is not advice. Read the current reprint.
- Regs 74A and 74B say which work a safety certificate covers. The tool names the timing only.
- Reg 74E(2A) covers a small stand-alone dwelling that has no consent. It states no period for the copy.
- The work classes are New Zealand law. For Australia the tool gives the paperwork rows only.
See also: Electricity Safety Regulations reg 57 and 59, Who may do electrical work in NZ and Test and tag.
Câu hỏi
Kết quả chỉ là công cụ hỗ trợ thiết kế. Đối chiếu với tiêu chuẩn hiện hành.
Công cụ này có phải là tư vấn pháp lý không?
Không. Công cụ này là chỉ dẫn, không phải phán quyết. Nó nêu quy định liệt kê công việc và báo các số liệu mà quy định đó có. Nó không cho biết bạn được phép làm gì. Hãy đọc bản in hiện hành của các quy định và hỏi WorkSafe hoặc thanh tra viên có giấy phép.
Công cụ báo cáo gì?
Loại công việc theo regulation 6A, việc regulation 65 có liệt kê giấy chứng nhận tuân thủ hay không, việc regulation 70 có liệt kê biên bản kiểm tra hay không, khoảng thời gian 20 ngày làm việc của regulation 74C, và các ngưỡng phụ tải tính toán của regulations 57 và 59.
Công cụ dùng phiên bản nào của các quy định?
Phiên bản tại ngày 15 tháng 1 năm 2026. Các số liệu công cụ báo giống với bản in lại ngày 4 tháng 4 năm 2016. Hãy kiểm tra phiên bản mới hơn trên website luật pháp New Zealand trước khi dựa vào bất kỳ kết quả nào.
Công cụ có áp dụng cho Úc không?
Có, về giấy tờ. Chọn một bang hoặc vùng lãnh thổ. Công cụ cho biết chứng nhận, nơi nộp, thời hạn, số bản sao, thời hạn lưu giữ và sổ đăng ký giấy phép. Mỗi dòng ghi rõ trang của cơ quan quản lý và ngày AmpSize đọc trang đó. Dòng chưa được đọc sẽ hiển thị "Xác nhận với cơ quan quản lý của bạn".
Nền
Các điều khoản và bảng mà công cụ này đọc
- Electricity (Safety) Regulations 2010 reg 6ALow-risk, high-risk and general prescribed electrical work
- Electricity (Safety) Regulations 2010 reg 57Exemption for domestic electrical wiring work
- Electricity (Safety) Regulations 2010 reg 70Record of inspection
- reg 57, 59, 65, 74C, 74EThresholds and periods for prescribed electrical work
Mọi điều khoản và bảng, kèm cách mỗi mục đã được kiểm chứng
Các bảng được kiểm tra lần cuối ngày 26 Sept 2026.
Công cụ liên quan
- Bảng kết quả thử nghiệm cho tủ điệnPrint a board test sheet with the limit for each test.AS/NZS 3017AS/NZS 3000Electricity (Safety) Regulations 2010
- Công cụ tính tiết diện cápFind the smallest cable size that passes each check.AS/NZS 3008.1.2AS/NZS 3008.1.1AS/NZS 3000
- Công cụ tính phụ tải cực đạiEstimate maximum demand for domestic or non‑domestic loads.AS/NZS 3000 Table C1/C2
Thông tin này có hữu ích không?